Objective

Finalize the Milestone 1 (MVP) Demo plan, define user scenarios, write the demo script, prepare the demo-data strategy, assign roles, and rehearse the presentation flow.

Work Done During Lab Session

1. Demo Structure & Scenario Design

We defined two complementary demo scenarios designed to maximize feature coverage with minimal overlap:

  • Web Scenario (4 minutes) -- Mentor Perspective: Demonstrates mentor profile management, availability scheduling, reviewing incoming mentorship requests, accepting/rejecting candidates, and viewing active mentorships.
  • Mobile Scenario (4 minutes) -- Mentee Perspective: Demonstrates the full mentee onboarding journey from registration through email verification, profile completion, mentor discovery, sending a mentorship request, and viewing mentorship status.

This split ensures each major MVP feature is shown exactly once, and the mentorship request workflow is demonstrated end-to-end across both platforms (sent on mobile, received and acted upon on web).

2. Script Writing

We wrote a detailed, timestamped script for the full 8-minute presentation. Each segment specifies the speaker, the actions performed on screen, and what the audience should observe. The script follows the format outlined in the lab instructions. The full script is included in the MVP Demo Plan wiki page.

3. Demo-Data Strategy

We designed a realistic data set to support both scenarios:

  • Mentor accounts pre-populated with professional profiles, availability, and varying mentee capacities.
  • Mentee accounts at different stages (one with an active mentorship, one with a pending request) to avoid creating data from scratch during the demo.
  • Edge case data including a rejected request and a mentor at full capacity to demonstrate system validation.

Full details are in the MVP Demo Plan wiki page.

4. Role Assignments

We assigned specific responsibilities for the demo day:

Role Assigned To
Web Demo Presenter & Narrator Muhammet Sami Cakmak
Web Demo Operator Amin Abu-Hilga
Mobile Demo Presenter & Narrator Ovgu Su Afsar
Mobile Demo Operator Burak Ogut
Backend & Architecture Q&A Mehmet Bora Sarioglu, Ibrahim Kayan
Infrastructure & Deployment Q&A Beratcan Dogan
Timekeeper Halis Tunay Aslan
Note-taker (customer feedback) Ibrahim Kayan

5. Deployment & Realistic Data

  • The application will be deployed and accessible via a secure public HTTPS URL (not run locally).
  • All demo data reflects realistic user journeys (real names, plausible bios, context-appropriate interests and skills) rather than placeholder or dummy values.

6. Backup Plan for Failure Cases

Failure Scenario Mitigation
Internet connection is down Pre-record a video walkthrough of both scenarios as a fallback.
Backend is unresponsive Have a local Docker Compose setup ready on a laptop as a backup environment.
Email verification service fails Have a pre-verified account ready to switch to and skip the verification step.
Mobile emulator crashes Use a second device or a pre-recorded screen capture of the mobile flow.
Database is empty or corrupted Maintain a SQL seed script that can repopulate demo data in under 30 seconds.

Individual Contributions

Amin Abu-Hilga

  • Drafted the web demo operator action steps and transition plan #163
  • Defined backup plan strategies for deployment failure scenarios #162
  • Contributed to demo role assignments and web presenter coordination #164

Ovgu Su Afsar

  • Authored the mobile demo scenario and mentee onboarding user story #163
  • Designed the mobile demo-data strategy for mentee accounts #163
  • Documented mobile demo findings in lab report #164

Muhammet Sami Cakmak

  • Drafted the web demo narration script with timestamped segments #163
  • Defined the mentor dashboard user scenario and feature walkthrough #162

Beratcan Dogan

  • Designed the demo-data seeding strategy and database population plan #163
  • Defined deployment requirements and HTTPS accessibility criteria #162
  • Contributed to backup plan for infrastructure failure cases #164

Ibrahim Kayan

  • Documented demo environment setup requirements for lab report #164
  • Contributed to demo-data strategy for mentor account profiles #163
  • Assigned as note-taker for customer feedback during demo #162

Burak Ogut

  • Planned the mobile demo operator workflow and device transition strategy #163
  • Defined mobile registration and profile completion demo steps #162

Mehmet Bora Sarioglu

  • Coordinated demo structure design and feature coverage matrix #162
  • Authored the MVP demo plan document with script and data strategy #163
  • Compiled and finalized the lab 7 report #164

Deliverables

  1. This Lab 7 Report (this page)
  2. MVP Demo Plan -- includes demo structure, user scenarios, full script, demo-data strategy, and role assignments (due April 3, 17:00)
Team Members

Lab Reports


Weekly Meetings


Customer Meetings


Stakeholder Meetings


Project Requirements


🎦 Scenarios and Mock-ups

Use Case Diagrams

Class Diagram

Sequence Diagrams

Test Plan and Coverage


Project Standards


Final Milestone and MVP Plan

MVP Report


Final Milestone Report

Per-Member Prompt Logs


Future Work

Clone this wiki locally