Meeting 2026 02 12
Google meet: meet.google.com/cfh-jboj-ifn
Date: 2026-02-12 (Thursday)
Time UK: 08:30 AM
Attendees:
- Review actions from previous meeting
- Report from EMLO edit integration testing scheduled for Tue 10 Feb, 2026
- Status of EMLO front testing
- Kanban review
EMLO integration testing
- The code for EMLO edit was deployed in the qa server and the databases were migrated succesfully. John needs to test the exporter and tweaker.
Status of code in the EMLO front production server
-
The code in the production system of EMLO front had all the changes in dev as of last week. Given this, we can close the old issues in the review column in EMLO front.
There was no need for a PR to deploy changes from dev to qa
Status on EMLO front testing code
- Currently the test code needs to be run from the command line. We will add a page on EMLO front, using which we can trigger the tests and view the test outcomes.
How do we integrate the exporter with EMLO edit
- We had a discussion on this. This details have been added to issue https://github.com/culturesofknowledge/emlo-project/issues/572. John will email us the shell script that triggers an export.
Design of matching letter features for EMLO front
- We had a look at the ticket 566 and decided we need input from Miranda.
-
Write documentation on using the exporter from the console within the docker container - Rama
-
Write documentation on using the tweaker from the console within the docker container - Hrafn
-
Deployment testing - John
- Test the exporter
- Test the tweaker
- Test collect works with EMLO edit
-
Move out old EMLO front issues from review column, as they have been tested - Anusha
-
Email shell script that triggers an export - John
I have added the text of the email to the issue https://github.com/culturesofknowledge/emlo-project/issues/572