Data Object and Field Reference
English | 简体中文
Applies to DecisioWorks v1.4.0. Current templates and validators remain authoritative for type and required-field rules.
The standardized data interface models business objects and relationships before source-system columns. This page explains the main fields. Check types, nullability, and defaults against the template version in use. A field being present, a relationship being valid, a model applying it, and a run obtaining a feasible solution are different findings.
See the complete field reference for every field's definition, type and nullability, and the Standardized Data Interface Guide for semantics and configuration exercises. This page remains a quick reference for commonly used fields.
| Object.field | Meaning | Validation |
|---|---|---|
time_unit.id |
Time-unit identifier | Referenced by due dates, capacity, material availability, and results |
time_unit.offset |
Sequence offset relative to the planning origin | Separate from the primary key; differences between IDs are not elapsed minutes |
time_unit.scale |
Time-unit duration in seconds | An hour is 3,600 seconds; define the shift behind a working-day window |
time_unit.status |
1 normally available, 0 unavailable, -1 special or optional | The planning configuration defines whether optional periods are used |
product.code/name |
Stable product identity | Code remains stable within a scenario |
product.property_1..3 |
Mapped business attributes | Define color, model, mold, family, or another real meaning |
order_info.priority |
Order-header priority | Does not replace line-item due dates or rules |
order_item.product |
Demanded product | Resolves to product
|
order_item.delivery_time |
Due time unit | Resolves to time_unit
|
order_item.number |
Demand quantity | Valid nonnegative business quantity |
order_info.created_at |
Order creation timestamp | Preserve the source timestamp rather than using it as the due-period reference |
product.vin |
Unique code of the finished item to which the product belongs | Express assembly quantities and material consumption separately |
The attribute mechanism supports additional dimensions. property_1..3 are three instances in the current template and reference attribute records rather than directly storing labels such as a color. name/code/value/is_key specify name, code, value, and key-attribute status. When a rule uses an attribute, confirm that it has been loaded and mapped.
| Object.field | Meaning | Validation |
|---|---|---|
process_route.product |
Product owning the route | Supports one or more candidate routes |
process.route |
Route owning the operation | Resolves to a valid route |
process.operation_number |
Operation identifier within a route | Unique within that route, separate from execution order |
process.seqno |
Operation sequence value | Equal values impose no precedence by themselves; parallel execution also depends on resources and other conditions |
process_adaptor.process/workcenter |
Executable resource mapping | Connects an operation to a work center |
process_adaptor.productivity |
Output per cycle for discrete processing; output per unit time for continuous processing | Define units such as pieces/cycle or liters/hour and the capability's interpretation |
process_adaptor.processing_time/setup_time |
Standard processing duration / process changeover duration | The current interface uses seconds; define initial preparation and repeated changeovers without double counting |
process_adaptor.batch_size |
Output quantity processed as a batch | For discrete processing, an integer multiple of output per cycle; demand need not already be a whole batch |
process_adaptor.OEE |
Overall equipment effectiveness | The current template defaults to 100 as a percentage; identify where the loss is applied |
process_adaptor.wip_buffer_size |
Work-in-process buffer capacity | Define its unit, default, and actual model interpretation |
process_adaptor.binding |
Joint-processing relationship | Distinct from shared-resource contention and material dependencies |
capacity.used |
Occupied or unavailable fraction, including maintenance accounted for on that basis | From 0 to 1; not utilization calculated from the new plan |
workcenter.parallelism/station_count |
Parallel capacity and station count | Avoid counting capacity twice |
workcenter.parent_id |
Parent work center | Supports hierarchy, attribute inheritance, rules at different levels, and aggregate analysis, without creating extra capacity |
workcenter.equipping_time |
Resource configuration or preparation time | Define its accounting scope separately from process changeover time |
shared_resource.binding/to |
Shared-resource work center / work center depending on it | A shared resource has its own calendar; multiple dependency links do not create multiple copies of its capacity |
The complete capacity expression is scale×(1−used)×|status|. For normal periods it simplifies to scale×(1−used). Optional periods retain an availability quantity, while planning policy determines whether to use them. Choose time granularity for the planning level and execution need, balancing precision, computational size, and adjustment flexibility.
| Object.field | Meaning | Validation |
|---|---|---|
ingredient.process |
Consuming operation | The key operation-level BOM relationship |
ingredient.material |
Required material | Resolves to a material record |
ingredient.number |
Material consumption per declared unit of operation output | Multiply by output quantity, not processing-cycle count |
kitting_information.time_unit |
Material-availability time | Uses the same time coordinate as the plan |
kitting_information.number |
Ready or available quantity at a time point | Map period increments, cumulative supply, and stock balances explicitly for the selected execution chain |
material.substitute |
Substitution relationship | Confirm its scope and selection priority |
material.binding |
Material dependency or coordinated selection | Explain separately from substitution groups |
material.vendor/extend |
Supplier / reserved extension information |
extend may represent supplier priority; it is not inherently a foreign key |
inventory_limit.upper_bound_acc/lower_bound_acc |
Cumulative receipt quantity bounds | Derived from opening stock, flows, and storage requirements, not closing inventory balances |
inventory_limit.binding/urgency |
Shared-inventory marker / urgency | Define common units, capacity allocation, and priority rules |
planning_result uses workcenter, time_unit, process, and number for operation-level results. number is output quantity, not a processing-cycle count. Adding outputs across operations does not establish finished-product delivery. value_1..3 are reserved fields; cycle number and position within a cycle are example interpretations.
The demonstration page's current-run result starts empty and updates after solving. A sample database may contain historical results, which must not be presented as a new run. Standardized results can inform the next input. Default dispatch preserves the source business database and uses separate result output; an explicitly configured write-back should preserve data and result versions.
Demanded products exist; products have routes; operation order is valid; operations have executable work centers. When material constraints are enabled, operation requirements link to the relevant materials and times. All time and quantity units are explicit. Map differing source names without changing field meanings to fit a scenario.
See the Glossary for common terms and the Standardized Data Interface for configuration relationships.
Product Home | DecisioWorks v1.4.0 | English / 中文
- What Is DecisioWorks / DecisioWorks 是什么
- Scenarios and Pain Points / 适用场景与痛点
- Quick Start / 快速开始
- Documentation Map / 文档地图
- Research and Commercial Editions / 研究版与商业版
- Whitepapers / 白皮书
-
Learning Center / 学习中心: 8 topics / 8 个专题
- Design Principles and Differentiation / 设计原则与差异化
- Architecture Overview / 总体架构
- Component Responsibilities / 组件职责
- Standard Actions and Orchestration / 标准动作与能力编排
- Objectives and Rule Control / 目标与规则控制
- Controlled Solving and Engine Adapters / 受控求解与模型适配
- Results, Evidence, and Feedback / 结果、证据与反馈
- Developer Guide Index / 开发手册索引
- Data Objects and Fields / 数据对象与字段
- Actions, Recipes, and Execution / 动作、配方与执行
- Runtime Status, Errors, and Limits / 运行状态、错误与限制