Interface 05 Quantity
中文 · Learning guide · Semantic guide
The bracket example produces four units per stamping cycle, takes 600 seconds per cycle, and uses 20-unit batches. Day-one demand is 80. Assume no initial setup, changeover, or scrap; OEE is 100, with no additional efficiency adjustment.
| Item | Value | Manual calculation |
|---|---|---|
productivity |
4 units/cycle | One cycle produces four units |
batch_size |
20 units/batch | 20÷4=5 cycles/batch |
| Demand | 80 units | 80÷20=4 batches |
| Processing cycles | 20 | 80÷4 |
| Processing time | 12000 seconds | 20×600=200 minutes |
The result quantity is 80 units, not 20 cycles. Assembly produces one unit per 120-second cycle, requiring 160 minutes for the same 80 units. Use the explicit unit “units/cycle” here. Continuous-output data requires a defined discrete processing unit and time conversion before using this template.
batch_size/productivity must correspond to whole processing cycles. Four units per cycle and an 18-unit batch would require 4.5 cycles, contradicting whole-cycle processing.
Demand-to-batch divisibility is a business policy. For demand 42 and batches of 20, output 40 leaves a shortage of two and output 60 creates a surplus of 18. If surplus, shortage, or split batches are permitted, state the policy and retain original demand 42. Silently replacing it with 60 would conceal the surplus.
Another mold produces A×2, B×2, and C×1 per cycle. A common adaptor binding expresses the relationship. Ten cycles produce 20, 20, and 10 units. Against demand 18, 20, and 12, the differences are surplus two, exact fulfillment, and shortage two. Twelve cycles produce 24, 24, and 12, giving surpluses six and four, with C exact.
These are manual candidates. Inventory, dates, cost, and configuration determine the choice. Do not add the same joint-processing time once for every output; confirm that the model accounts for the shared event.
Assume four units per 20-minute cycle and a 480-minute shift. Applying an 85% efficiency factor once gives 408 minutes. A continuous estimate is 81.6 units; whole-cycle processing permits 20 cycles, or 80 units. With 20-unit batches, this remains four batches. The discrete plan cannot use 81.6 as its output.
The current template defaults OEE to 100, a percentage representation. Lower efficiency can reduce effective capacity or, under an explicit conversion, increase the occupied time needed for the same output. Confirm where the selected model accounts for the loss and count it only once. Entering 85 alone does not establish that it was applied. Retain source data and conversion rules.
For continuous processing, productivity can mean output per unit time. At 120 liters/hour, two effective operating hours produce 240 liters under a no-loss teaching assumption. This uses liters/hour rather than the earlier pieces/cycle.
First select a model interpretation that uses that unit. A projection into the current discrete template could explicitly represent a one-hour processing unit as 120 liters and 3,600 seconds. Finer windows require corresponding units and conversion; 120 cannot simply be treated as output from an arbitrary cycle. This is a dimensional example, not a recorded continuous-production solve.
Change the base cycle duration from 600 to 900 seconds, retaining output and batch size. Eighty units still require 20 cycles, now 18,000 seconds or 300 minutes. Day-one stamping has 360 available minutes, leaving 60. This checks resource-time totals; assembly, materials, and windows still determine full feasibility.
Product Home | DecisioWorks v1.4.0 | English / 中文
- What Is DecisioWorks / DecisioWorks 是什么
- Scenarios and Pain Points / 适用场景与痛点
- Quick Start / 快速开始
- Documentation Map / 文档地图
- Research and Commercial Editions / 研究版与商业版
- Whitepapers / 白皮书
-
Learning Center / 学习中心: 8 topics / 8 个专题
- Design Principles and Differentiation / 设计原则与差异化
- Architecture Overview / 总体架构
- Component Responsibilities / 组件职责
- Standard Actions and Orchestration / 标准动作与能力编排
- Objectives and Rule Control / 目标与规则控制
- Controlled Solving and Engine Adapters / 受控求解与模型适配
- Results, Evidence, and Feedback / 结果、证据与反馈
- Developer Guide Index / 开发手册索引
- Data Objects and Fields / 数据对象与字段
- Actions, Recipes, and Execution / 动作、配方与执行
- Runtime Status, Errors, and Limits / 运行状态、错误与限制