Repository navigation
Progress
Start here · Questions · Progress · People decide
This board separates work produced, human decisions and performance demonstrated in testing. It gives a practical picture of what we can do next.
| Measure | Current record |
|---|---|
| Questions mapped | 96 |
| Work areas connected | 13 |
| Questions with AI-generated options prepared | 96 |
| Primary research references | 51 |
| Council integration analysis | Two supplied plans, source crosswalk and proposed comparison path |
| Review packages prepared | 3 |
| Human approvals recorded and checked | 0 |
| Operating pilot sites | Site discussions and pilot preparation are ahead |
| All-weather performance | Design basis, drawings and measurements are the next evidence |
| Research baseline | AI options and preserved user prompt, primary-source comparisons, and the original library; see Evidence |
| Job | Useful output | Questions | Work state |
|---|---|---|---|
| JOB-01 Shape the first service | A service brief and everyday/disaster journeys with people and handovers | OPS-01, OPS-02, GOV-01 | ready for research and alternatives |
| JOB-02 Draw the weather-ready kiosk family | Exposure requirements, comparison layouts, mounting and maintenance access | PHY-01, PHY-02, PHY-03 | ready for research and alternatives |
| JOB-03 Measure the energy job | Workload measurements, energy budget, reserve and power-change test plan | ENE-01, ENE-02, ENE-03 | ready for research and alternatives |
| JOB-04 Map the available connections | Network layout, message sizes, coverage and disconnected-group test plan | COM-01, COM-02, SW-02 | ready for research and alternatives |
| JOB-05 Build the information agreement | Source owners, validity, correction, publication and request record designs | DAT-01, DAT-02, SW-03 | ready for research and alternatives |
| JOB-06 Design the working software | Components, safe updates, recovery and device status | SW-01, SW-03, SW-04 | ready for research and alternatives |
| JOB-07 Work through Aura and learning | Personal navigation, chosen context and a source-led practical learning journey | AUR-01, AUR-02, AUR-03 | ready for research and alternatives |
| JOB-08 Prepare useful place exercises | Evidence-backed place models, scenario inputs and comparison methods | TWIN-01, TWIN-02, TEST-01 | ready for research and alternatives |
| JOB-09 Build the operating and support model | People, responsibility, shifts, cultural engagement and handover | GOV-01, GOV-02, OPS-01 | ready for research and alternatives |
| JOB-10 Price continuing service | Parts, installation, wages, connections, upkeep, replacement and funding leads | FIN-01, FIN-02 | ready for research and alternatives |
| JOB-11 Define the first project connections | Public notice/calendar/media and later resource/mobility/energy interfaces | ECO-01, ECO-02, ECO-03 | ready for research and alternatives |
| JOB-12 Plan measurements and exercises | A two-to-three-day practical test plan, digital-twin simulations of chosen duration, and bench, network, accessibility and later field evidence | TEST-01, TEST-02, TEST-03 | ready for research and alternatives |
| JOB-13 Check the wiki as a practical workshop | Clear questions, working links, review checks and the next useful jobs | WRK-01, WRK-04, WRK-05, WRK-06 | ready for research and alternatives |
| JOB-14 Prepare the first organising meeting and shared handbook trial | Proposed charter, 90-minute meeting pack, chosen records arrangement and four-week kiosk exercise, designed for XR, personal Auras, AI/SI and robotics | GOV-01, GOV-02, DAT-05, WRK-01, WRK-03, WRK-04 | model and templates prepared; participant discussion and adoption are next |
| JOB-15 Prepare the Council-facing comparison exercise | Plan-mapped interface proposal, agreed-baseline questions, comparison measures and sample-record demonstration for eventual Council discussion | OPS-05, DAT-01, SW-06, GOV-02, TEST-01, TWIN-06, WRK-04 | AI analysis and evidence template prepared; exercise design and reviewer discussion are next |
Update the question's assigned person or AI assistant, work state and evidence when work changes. Bring a completed proposal to the human review queue. Record measurements against a named configuration and test, so a drawing, a bench result and a field result each show their own contribution.
The dashboard is generated from the records in the repository. It is refreshed when those records are rebuilt and published; it is not a background monitor of people or devices.
Growing capability together · Planning and design underway · People decide · Repository
Aura Disaster Resilience
- Start here
- The whole system
- About and topic slugs
- First choices
- All-weather design
- Questions
- Progress
- Working together
- People decide
- Professional review
- AI assistant jobs
- Council integration
- Council plan crosswalk
- Guardian IMS and QIT Plus
- Ecosystem
- Agreed direction
- Evidence
- Source library
- AI research and prompt
- Research sources
- Useful words/glossary
- Rights and discovery
Work areas
- Everyday service and disaster work
- Weather-ready kiosks and places
- Energy and backup power
- Connections and messages
- Information people can trust
- Software and device care
- Personal Aura and learning
- Place models and practice exercises
- Community and operating responsibility
- Budget and continuing support
- Tests and field learning
- Project connections
- Working together and human review