Repository navigation
Question COM 03
COM-03 Where should antennas, links to the wider network and cables go so they work well, can be maintained and suit the site's weather conditions?
Start here · Questions · Progress · People decide
The mounting position affects signal, cable losses, electrical protection, repair access and storm performance.
Draw mounting and cable-route options. Show clear signal paths where needed, structures and fixings, electrical surge protection, access for repairs and conditions for bringing equipment down. Label links that still need a field test.
- Straddie Disaster Kiosk Pitch.pdf — reviewed source; public copy can be added through the evidence process
- Professional review and comparison of proposed improvements (When this work overlaps professional or public-authority responsibilities, compare the proposal and Luke's research with applicable industry/global best practice and relevant legal-engine sources. Record differences, reasonable improvements and deficiencies, with the responsible reviewer and response. Routine authorised drafting and wiki work can advance.)
For discussion and review · research checked 2026-10-20. These are AI-generated options and transfer assessments. The user's request and research method identify the source of this work. The source catalogue states what the references establish. The decision and approval record retains its own status.
Select antenna positions from measured paths, structural assessment and maintainable cable routes. Compare a lower protected mounting with a higher exposed option, including sky view for satellite and a reviewed withdrawal plan. Treat connectors, earthing and surge protection as part of the installation.
AI-generated adaptation of an existing pattern. Conduct temporary ground-level link surveys before designing permanent mounts. Compare the chosen radio's lawful Australian settings, cable loss and access needs; have qualified reviewers assess supports and electrical protection for the complete site.
Research basis: Class licences for radiocommunications · Rittal protective roof SZ 2475000.
AI-generated future concept. Develop a low-height stowable antenna arrangement with position sensing and manual recovery. A future Aura could explain the expected coverage change when stowed, based on earlier measurements rather than assuming continued high-level coverage.
- How to prepare: nbn and emergency events: AI transfer assessment: Temporary telecommunications infrastructure illustrates portable restoration alongside fixed equipment. Local difference to check: Each island position still requires site permission, weather assessment and actual link testing.
- Measure signal quality and throughput at proposed heights and wet-weather conditions when safe.
- Review mounting, cable penetrations, lightning/surge and maintenance access with relevant professionals.
Who reviews: Proposed radio designer with mechanical/electrical reviewers; role and appointment awaiting confirmation
Connected questions: PHY-02, COM-02
Work state: open. Assigned person or AI assistant: Ready to be assigned.
Research and alternatives can move ahead while connected decisions develop. Before acting on a choice, check the people, evidence and approved scope in People decide.
Growing capability together · Planning and design underway · People decide · Repository
Aura Disaster Resilience
- Start here
- The whole system
- About and topic slugs
- First choices
- All-weather design
- Questions
- Progress
- Working together
- People decide
- Professional review
- AI assistant jobs
- Council integration
- Council plan crosswalk
- Guardian IMS and QIT Plus
- Ecosystem
- Agreed direction
- Evidence
- Source library
- AI research and prompt
- Research sources
- Useful words/glossary
- Rights and discovery
Work areas
- Everyday service and disaster work
- Weather-ready kiosks and places
- Energy and backup power
- Connections and messages
- Information people can trust
- Software and device care
- Personal Aura and learning
- Place models and practice exercises
- Community and operating responsibility
- Budget and continuing support
- Tests and field learning
- Project connections
- Working together and human review