Repository navigation
Question SW 08
SW-08 How will the island's kiosks and portable equipment stay connected through the routes available at each proposed site?
Start here · Questions · Progress · People decide
Radio reach, a local relay and an internet connection have different strengths and failure points. Field evidence will show which combination supports the service.
Draw candidate device roles and message routes. Prepare site checks for reach, connection quality, heavy traffic, separated areas, loss of an internet connection point and a portable relay. Show which service functions work on each route and measure recovery against OPS-01.
- comprehensive rebuild plan — reviewed source; public copy can be added through the evidence process
- Straddie_Disaster_Kiosk_Pitch.pdf
- Web3_Sensorium_for_Science_Debate.pdf (pp.5-9)
- Aura_Teacher_Training_60_Days.pdf (p.55)
- Professional review and comparison of proposed improvements (When this work overlaps professional or public-authority responsibilities, compare the proposal and Luke's research with applicable industry/global best practice and relevant legal-engine sources. Record differences, reasonable improvements and deficiencies, with the responsible reviewer and response. Routine authorised drafting and wiki work can advance.)
For discussion and review · research checked 2026-10-20. These are AI-generated options and transfer assessments. The user's request and research method identify the source of this work. The source catalogue states what the references establish. The decision and approval record retains its own status.
Map each site's actual local and outside connections, then assign routes for small urgent notices, private requests and larger learning material. Keep a working local doorway at separated sites. Choose relay positions and fallback journeys from measured trials and agreed access.
AI-generated adaptation of an existing pattern. Compare direct local links, available internet connections and approved portable synchronisation using the same message contract. A delay-tolerant candidate would be evaluated alongside simpler links for service retained and operator effort.
Research basis: RFC 9171: Bundle Protocol Version 7.
AI-generated future concept. Investigate a movable relay carried by an authorised person, vehicle or future robot when a fixed link is lost. Trial safe positions, battery use and actual traffic capacity before including it in the service promise.
Research basis: Robots to the rescue in hazardous environments.
- Robots to the rescue in hazardous environments: AI transfer assessment: CSIRO research combined robot mapping with relays in difficult underground communications. Local difference to check: Island bush, salt, wind, public access and day-long workloads require different equipment assessment, permissions and field trials.
- Measure candidate paths with busy links, an unavailable gateway, separated groups and one portable unit.
- State the largest useful message and maximum acceptable delay for each supported task, then compare observed performance.
Who reviews: Proposed communications lead and deployment operations lead (unconfirmed)
Connected questions: OPS-01, SW-02, SW-07
Work state: open. Assigned person or AI assistant: Ready to be assigned.
Research and alternatives can move ahead while connected decisions develop. Before acting on a choice, check the people, evidence and approved scope in People decide.
Growing capability together · Planning and design underway · People decide · Repository
Aura Disaster Resilience
- Start here
- The whole system
- About and topic slugs
- First choices
- All-weather design
- Questions
- Progress
- Working together
- People decide
- Professional review
- AI assistant jobs
- Council integration
- Council plan crosswalk
- Guardian IMS and QIT Plus
- Ecosystem
- Agreed direction
- Evidence
- Source library
- AI research and prompt
- Research sources
- Useful words/glossary
- Rights and discovery
Work areas
- Everyday service and disaster work
- Weather-ready kiosks and places
- Energy and backup power
- Connections and messages
- Information people can trust
- Software and device care
- Personal Aura and learning
- Place models and practice exercises
- Community and operating responsibility
- Budget and continuing support
- Tests and field learning
- Project connections
- Working together and human review