Repository navigation
Question ENE 01
ENE-01 How much power does every part use when starting, waiting, working and communicating, and how does that change through the day?
Start here · Questions · Progress · People decide
Measuring the whole system lets us plan both demanding simulations and the essential service during an outage.
Make a device-by-device power sheet and daily energy budget. Include screens at different brightness, radio bursts, storage, cooling and energy lost in conversion. Record peak demand, measurement method and uncertainty; compare essential-service and intensive-computing schedules.
- Straddie Disaster Kiosk Pitch.pdf — reviewed source; public copy can be added through the evidence process
- Professional review and comparison of proposed improvements (When this work overlaps professional or public-authority responsibilities, compare the proposal and Luke's research with applicable industry/global best practice and relevant legal-engine sources. Record differences, reasonable improvements and deficiencies, with the responsible reviewer and response. Routine authorised drafting and wiki work can advance.)
For discussion and review · research checked 2026-10-20. These are AI-generated options and transfer assessments. The user's request and research method identify the source of this work. The source catalogue states what the references establish. The decision and approval record retains its own status.
Start with a measured energy ledger for each device and operating state. Record startup peaks separately from daily watt-hours, including display brightness, radio transmission, cooling and conversion losses. Compare always-on rich service with an essential local service plus scheduled larger jobs.
AI-generated adaptation of an existing pattern. Compare shunt-based DC measurement and a suitable AC meter, checking both against a reference. Include a Starlink Mini only as a candidate uplink: its published 25–40 W average needs confirmation on the actual unit.
Research basis: Cerbo GX manual: configuration · Starlink Mini specification sheet, pages 3 and 8.
AI-generated future concept. Give each AI, XR and robotics job an estimated energy allowance and measured completion record. A local scheduler could offer a lower-energy route or defer work while reserving power for public information and request handling.
- Finding new energy solutions for the town of Kalbarri: AI transfer assessment: Kalbarri links local supply with community demand adjustment during islanded operation. Local difference to check: Kiosk priorities and actual device energy need finer measurement than a town-scale comparison provides.
- Measure startup, idle, busy and failed-network states on actual devices.
- Publish watt-hours per day with sampling method, uncertainty and service assumptions.
Who reviews: Proposed power designer with software and communications leads; role and appointment awaiting confirmation
Connected questions: OPS-01, PHY-01, COM-01
Work state: open. Assigned person or AI assistant: Ready to be assigned.
Research and alternatives can move ahead while connected decisions develop. Before acting on a choice, check the people, evidence and approved scope in People decide.
Growing capability together · Planning and design underway · People decide · Repository
Aura Disaster Resilience
- Start here
- The whole system
- About and topic slugs
- First choices
- All-weather design
- Questions
- Progress
- Working together
- People decide
- Professional review
- AI assistant jobs
- Council integration
- Council plan crosswalk
- Guardian IMS and QIT Plus
- Ecosystem
- Agreed direction
- Evidence
- Source library
- AI research and prompt
- Research sources
- Useful words/glossary
- Rights and discovery
Work areas
- Everyday service and disaster work
- Weather-ready kiosks and places
- Energy and backup power
- Connections and messages
- Information people can trust
- Software and device care
- Personal Aura and learning
- Place models and practice exercises
- Community and operating responsibility
- Budget and continuing support
- Tests and field learning
- Project connections
- Working together and human review