Repository navigation
Question ENE 06
ENE-06 How will the kiosk start again after a flat battery, damaged stored data, repeated voltage drops or loss of a reliable clock?
Start here · Questions · Progress · People decide
A planned restart restores useful information and lets people see when the time or freshness of a notice needs checking.
Write and practise the restart sequence. Check stored records, show a clear status during recovery, explain uncertain time, protect queued messages and test repeated power interruptions. A brownout is a drop in supply voltage; black start means starting after all normal power has been lost.
- Straddie Disaster Kiosk Pitch.pdf — reviewed source; public copy can be added through the evidence process
- Professional review and comparison of proposed improvements (When this work overlaps professional or public-authority responsibilities, compare the proposal and Luke's research with applicable industry/global best practice and relevant legal-engine sources. Record differences, reasonable improvements and deficiencies, with the responsible reviewer and response. Routine authorised drafting and wiki work can advance.)
For discussion and review · research checked 2026-10-20. These are AI-generated options and transfer assessments. The user's request and research method identify the source of this work. The source catalogue states what the references establish. The decision and approval record retains its own status.
Give the kiosk a recovery path that starts essential information first, checks stored records and then enables larger services. Preserve queued messages across repeated power interruptions, identify uncertain time clearly and compare a known-good recovery image with a replaceable preconfigured computer module.
AI-generated adaptation of an existing pattern. Prototype supported boot watchdog and alternate-image recovery, with protected configuration backups and a tested spare. Check voltage stability and local storage recovery before interpreting a successful reboot as successful service restoration.
Research basis: Raspberry Pi EEPROM bootloader documentation · NIST's IoT Cybersecurity Capabilities Catalog.
AI-generated future concept. Develop an independent low-power supervisor that compares expected startup stages with observed health. An Aura could explain the fault and propose the next permitted check while the supervisor controls a bounded restart policy.
- Mallacoota Area Grid Storage community updates: AI transfer assessment: Mallacoota's updates distinguish equipment availability from successful automatic and remote startup. Local difference to check: Kiosk startup also requires intact records, trustworthy status and a usable public interface.
- Inject repeated brownouts and incomplete writes in a controlled bench exercise.
- Reconcile message queues and uncertain clocks before reconnecting simulated sites.
Who reviews: Proposed embedded reliability lead with authorised publisher role; role and appointment awaiting confirmation
Connected questions: DAT-01, ENE-04, ENE-05, COM-04
Work state: open. Assigned person or AI assistant: Ready to be assigned.
Research and alternatives can move ahead while connected decisions develop. Before acting on a choice, check the people, evidence and approved scope in People decide.
Growing capability together · Planning and design underway · People decide · Repository
Aura Disaster Resilience
- Start here
- The whole system
- About and topic slugs
- First choices
- All-weather design
- Questions
- Progress
- Working together
- People decide
- Professional review
- AI assistant jobs
- Council integration
- Council plan crosswalk
- Guardian IMS and QIT Plus
- Ecosystem
- Agreed direction
- Evidence
- Source library
- AI research and prompt
- Research sources
- Useful words/glossary
- Rights and discovery
Work areas
- Everyday service and disaster work
- Weather-ready kiosks and places
- Energy and backup power
- Connections and messages
- Information people can trust
- Software and device care
- Personal Aura and learning
- Place models and practice exercises
- Community and operating responsibility
- Budget and continuing support
- Tests and field learning
- Project connections
- Working together and human review