Repository navigation
Question PHY 07
PHY-07 How will separate equipment spaces, drains, cable openings and power shut-offs keep a fault in one part from spreading to people or the essential information service?
Start here · Questions · Progress · People decide
Careful separation lets the design deal with a broken screen, water entry, battery fault or high-power computer failure.
Draw the compartments and every opening between them. Show how each fault could spread, how power is made safe, where people are kept clear and how service returns. If electromagnetic shielding is included, define the protection to measure and the test needed.
- Straddie Disaster Kiosk Pitch.pdf — reviewed source; public copy can be added through the evidence process
- Professional review and comparison of proposed improvements (When this work overlaps professional or public-authority responsibilities, compare the proposal and Luke's research with applicable industry/global best practice and relevant legal-engine sources. Record differences, reasonable improvements and deficiencies, with the responsible reviewer and response. Routine authorised drafting and wiki work can advance.)
For discussion and review · research checked 2026-10-20. These are AI-generated options and transfer assessments. The user's request and research method identify the source of this work. The source catalogue states what the references establish. The decision and approval record retains its own status.
Separate faults by design: keep public controls, stored energy, power conversion and information service in reviewed compartments. Map every opening and shared cable, provide labelled isolation, and ensure one failed module can be removed while an independent notice layer explains available service.
AI-generated adaptation of an existing pattern. Have the electrical designer compare separate cabinets with protected internal sections, documenting fault paths and safe maintenance access. Use enclosure accessories only within their documented installation conditions and inspect the completed openings.
Research basis: Rittal protective roof SZ 2475000 · Permanently connected generators.
AI-generated future concept. Develop a small independently powered notice-and-status cartridge that remains readable when the main cabinet is isolated. A tested physical boundary would separate it from high-energy faults; a retained image would always carry its update time.
Research basis: E Ink technology benefits.
- Permanently connected generators: AI transfer assessment: Source isolation is an explicit design responsibility in fixed generator connections. Local difference to check: A kiosk's battery and DC fault paths require their own engineered protection and inspection.
- Review all drains, glands, barriers and isolation points on the assembled design.
- Define any electromagnetic shielding claim as a separately measured protection objective.
Who reviews: Proposed electrical safety and mechanical reviewers with operator; role and appointment awaiting confirmation
Connected questions: PHY-04, PHY-05, ENE-04
Work state: open. Assigned person or AI assistant: Ready to be assigned.
Research and alternatives can move ahead while connected decisions develop. Before acting on a choice, check the people, evidence and approved scope in People decide.
Growing capability together · Planning and design underway · People decide · Repository
Aura Disaster Resilience
- Start here
- The whole system
- About and topic slugs
- First choices
- All-weather design
- Questions
- Progress
- Working together
- People decide
- Professional review
- AI assistant jobs
- Council integration
- Council plan crosswalk
- Guardian IMS and QIT Plus
- Ecosystem
- Agreed direction
- Evidence
- Source library
- AI research and prompt
- Research sources
- Useful words/glossary
- Rights and discovery
Work areas
- Everyday service and disaster work
- Weather-ready kiosks and places
- Energy and backup power
- Connections and messages
- Information people can trust
- Software and device care
- Personal Aura and learning
- Place models and practice exercises
- Community and operating responsibility
- Budget and continuing support
- Tests and field learning
- Project connections
- Working together and human review