Repository navigation
Question PHY 01
PHY-01 What should the sheltered learning kiosk, fixed outdoor kiosk, portable continuity kit and replaceable field devices each do?
Start here · Questions · Progress · People decide
Clear jobs for each type let people practise the same service in a workshop, at a public site and during a disaster.
Draw four use cards showing who uses each type, what it provides, how long it stays in place, weather limits, when it is brought inside or replaced, and what it relies on. Compare at least two ways to share the work.
- Straddie Disaster Kiosk Pitch.pdf — reviewed source; public copy can be added through the evidence process
- GPT Straddie Disaster Kiosks.pdf — reviewed source; public copy can be added through the evidence process
- Professional review and comparison of proposed improvements (When this work overlaps professional or public-authority responsibilities, compare the proposal and Luke's research with applicable industry/global best practice and relevant legal-engine sources. Record differences, reasonable improvements and deficiencies, with the responsible reviewer and response. Routine authorised drafting and wiki work can advance.)
Starting idea for review: For review: develop these as separate types, with a clear service and test plan for each.
For discussion and review · research checked 2026-10-20. These are AI-generated options and transfer assessments. The user's request and research method identify the source of this work. The source catalogue states what the references establish. The decision and approval record retains its own status.
Consider four complementary roles: a sheltered learning doorway, a reviewed outdoor information point, a carryable continuity station and small replaceable relays or sensors. Share formats and spare modules so losing one housing still leaves useful local service.
AI-generated adaptation of an existing pattern. Compare a sheltered screen with a protected outdoor cabinet and a Pelican-style carry case. Each would run the same local information package but carry its own exposure and operating limits.
Research basis: Rittal protective roof SZ 2475000 · Pelican 1507 Air Case · How to prepare: nbn and emergency events.
AI-generated future concept. Develop a common removable service module that identifies its housing and loads the matching power, access and weather profile. An Aura could guide an authorised swap while preserving the outgoing device's records.
- How to prepare: nbn and emergency events: AI transfer assessment: NBN Co's temporary equipment illustrates distinct restoration and community-connectivity roles. Local difference to check: This project would develop its own host agreements and equipment; no NBN deployment is committed.
- Draw and weigh a working packing layout for each role.
- Agree the service preserved after losing each role in turn.
Who reviews: Proposed service owner, mechanical designer and community access reviewers; role and appointment awaiting confirmation
Connected questions: OPS-01
Work state: open. Assigned person or AI assistant: Ready to be assigned.
Research and alternatives can move ahead while connected decisions develop. Before acting on a choice, check the people, evidence and approved scope in People decide.
Growing capability together · Planning and design underway · People decide · Repository
Aura Disaster Resilience
- Start here
- The whole system
- About and topic slugs
- First choices
- All-weather design
- Questions
- Progress
- Working together
- People decide
- Professional review
- AI assistant jobs
- Council integration
- Council plan crosswalk
- Guardian IMS and QIT Plus
- Ecosystem
- Agreed direction
- Evidence
- Source library
- AI research and prompt
- Research sources
- Useful words/glossary
- Rights and discovery
Work areas
- Everyday service and disaster work
- Weather-ready kiosks and places
- Energy and backup power
- Connections and messages
- Information people can trust
- Software and device care
- Personal Aura and learning
- Place models and practice exercises
- Community and operating responsibility
- Budget and continuing support
- Tests and field learning
- Project connections
- Working together and human review