The field reference shows where values belong. This page explains how records connect and which quantities can be compared. Identify source objects by their business codes, then translate their references into target record IDs.
| Relationship | Current fields | What to check |
|---|---|---|
| An order contains multiple lines | order_item.information → order_info.id |
Every line belongs to an existing order; split one product across due periods when needed |
| Multiple demand lines can reference one product | order_item.product → product.id |
Use the product ID, not the order-line ID |
| A product references records in its attribute dimensions | product.property_i → property_i.id |
Keep foreign keys, text labels and numeric values distinct |
| A product can have alternative routes | process_route.product → product.id |
Alternatives are manufacturing choices, not additional demand |
| A route contains operations | process.route → process_route.id |
operation_number identifies an operation within the route; seqno defines precedence |
| An operation can run on alternative resources | process_adaptor.process/workcenter |
Each record describes one operation-resource combination and its parameters |
| An operation uses materials | ingredient.process/material |
Define the consumption basis and trace each material to its supply |
Equal seqno values mean there is no precedence between those operations. They do not need to be made unique. Whether the operations can run simultaneously is a separate resource and material question.
| Reference | Target | Business question |
|---|---|---|
order_item.delivery_time |
time_unit.id |
When is demand due? |
capacity.time_unit |
time_unit.id |
Which period does this resource availability describe? |
kitting_information.time_unit |
time_unit.id |
When can the material be used? |
inventory_limit.time_unit |
time_unit.id |
At which point is cumulative receipt checked? |
planning_result.time_unit |
time_unit.id |
In which period is operation output recorded? |
capacity.workcenter |
workcenter.id |
Which resource has this unavailable fraction? |
workcenter.parent_id |
workcenter.id |
Which organizational node owns the resource? |
shared_resource.binding/to |
Two workcenter.id values |
Which shared resource serves which target resource? |
The resource hierarchy should lead to a root without self-reference or cycles. Check shared-resource links for accidental self-binding as well. A shared resource may serve multiple targets, and a target may depend on multiple shared resources.
Calendar completeness depends on the resources and periods included in a run. When a resource-period record is missing, determine whether availability is unconfigured or covered by an explicit default. Do not assume full availability.
kitting_information.material references a material. inventory_limit.product references a product. Keep their inventory meanings distinct: the former describes readiness for operation consumption; the latter constrains cumulative production receipts of a product.
planning_result.process leads through the route to the product; workcenter identifies the actual resource. In addition to existing individually, the operation and resource should form an allowed combination for the scenario. Delivery quantities must follow the manufacturing path actually selected.
Some references are nullable in the database. A particular exercise or capability may still require them. For example, this course needs both operation and resource references to recalculate its result rows.
| Field | Object | Meaning |
|---|---|---|
binding |
material |
Dependent material-choice group |
binding |
process_adaptor |
Joint-processing group |
binding |
inventory_limit |
Shared-inventory group |
binding |
shared_resource |
Shared-resource work-center ID; a foreign key |
priority |
Order, route, adaptor, BOM | Preference within that object type; check the configured ordering direction |
number |
Order line | Demand quantity |
number |
Operation BOM | Material requirement on the declared basis |
number |
Material readiness | Available quantity on the declared incremental or cumulative basis |
number |
Planning result | Operation output quantity |
Equal group numbers do not create cross-table relationships. Material binding=1 and inventory binding=1, for example, are unrelated unless a separate mapping explicitly connects them.
These calculations assume discrete processing on one resource, with no scrap or setup losses. Define additional conversions when applying OEE, parallel processing, joint output or shared inventory.
| Question | Calculation | Example |
|---|---|---|
| Available time in a normal period | scale × (1 − used) |
28,800 seconds × 0.75 = 21,600 seconds |
| Processing cycles | Output ÷ output per cycle | 80 ÷ 4 = 20 cycles |
| Pure processing time | Cycles × cycle duration | 20 × 600 seconds = 200 minutes |
| Whole-batch configuration | Batch ÷ output per cycle must be an integer | 20 ÷ 4 = 5 cycles per batch |
| Material consumption | Operation output × requirement per piece | 80 assembled pieces × 2 fasteners = 160 fasteners |
| Cumulative supply | Opening availability + effective later increments | 80 + 40 = 120 pieces |
| Ending inventory | Opening stock + cumulative receipts − cumulative issues | 20 + 120 − 120 = 20 pieces |
If 80 pieces pass through stamping and assembly, finished output is 80 pieces. Adding the two operation rows gives 160 operation-output records, not 160 finished pieces.
Structure: tables, fields, types, primary keys and foreign keys.
Business meaning: units, relationship direction, time coverage, batch rules, supply and inventory conventions.
Run behavior: the resource, material and precedence rules actually used by the selected configuration, and whether the output can be checked against them.
The accompanying validator checks a defined subset of structure and business rules for the worked example. Add capability-specific checks for a complete production scenario. Select a suitable configuration pattern, then follow the worked example.
Product Home | DecisioWorks v1.4.0 | English / 中文
- What Is DecisioWorks / DecisioWorks 是什么
- Scenarios and Pain Points / 适用场景与痛点
- Quick Start / 快速开始
- Documentation Map / 文档地图
- Research and Commercial Editions / 研究版与商业版
- Whitepapers / 白皮书
-
Learning Center / 学习中心: 8 topics / 8 个专题
- Design Principles and Differentiation / 设计原则与差异化
- Architecture Overview / 总体架构
- Component Responsibilities / 组件职责
- Standard Actions and Orchestration / 标准动作与能力编排
- Objectives and Rule Control / 目标与规则控制
- Controlled Solving and Engine Adapters / 受控求解与模型适配
- Results, Evidence, and Feedback / 结果、证据与反馈
- Developer Guide Index / 开发手册索引
- Data Objects and Fields / 数据对象与字段
- Actions, Recipes, and Execution / 动作、配方与执行
- Runtime Status, Errors, and Limits / 运行状态、错误与限制