Source of truth: RELEASE.md, kept in the repository and copied here. The diagrams, the gate table and the publishing section were added to this copy on 8 September 2026, drawn from RELEASE.md itself,
.github/workflows/sbom.ymlandsign-release.yml, and therefs/heads/masterandrefs/tags/v*rulesets. The release history they describe - which release shipped when, on what schema, behind what gate - is in Changes Since 6.2.10. Re-copied from master 92b8f9f63 on 26 September 2026, brought up that day to the tag v6.3.4 (51e2dbda0), the release, and brought up on 29 September 2026 to the document as it stands for 6.3.6, inbatch42atd8a84f66cwith the branchb42-feeds-docs: 6.3.6 is the last release for the time being, and A security release during the pause says how a fix still ships - fixed and tested by hand before anything is pushed, landed through the batch's merge request, and released by the tag's pipeline, with the five steps only the owner can take and the fallback when Authenticode cannot be had; The release on GitLab, the release jobs for 6.3.5 onwards, which collect from 6.3.6 fifty-seven files (the AArch64 and per-distribution packages, the AppImages, the source tarball and the Helm chart among them), each with its bundle and a.sigstore.jsoncopy, and the release's SLSA provenance, and which everybatch*branch's pipeline rehearses without publishing; no release tag has run them yet; A release made by hand, the SHA-256 sums file 6.3.4 carries, signed with the release tags' SSH key; and steps 11 to 13 kept as the history of how the releases up to 6.3.3 were made on GitHub. The notes marked Now at steps 9, 11, 12 and 13 are this wiki's, saying where a step stands today. 6.3.4 was built and Authenticode-signed by hand, outside either chain, and published as a GitLab release on 27 September 2026 with no Sigstore bundle, so that every server is upgraded to it by hand (Upgrading Guide).
The order below is not advisory. Each rule exists because violating it has already cost a release cycle or nearly shipped a defect.
Status since 18 September 2026. GitHub has been unavailable to the project
since 18 September 2026, and its home has been
GitLab since 22 September
2026. Steps 11 to 13 below describe the release chain as it ran on GitHub -
the draft release, the Linux packages, the SBOMs, Sigstore and Authenticode
signing, the installer smoke test and the package managers as GitHub Releases
and GitHub Actions - and are kept as the history of how releases up to 6.3.3
were made. From 6.3.5 a release is made by the tag's GitLab pipeline instead:
The release on GitLab, below, replaces steps 11 and 12
from the tag on. 6.3.4 was built and Authenticode-signed by hand, between the
two, and carries no Sigstore bundle; its sums file is signed with the release
tag's SSH key instead (A release made by hand). The bench steps run as written; step 9
reads the scan reports of the commit's GitLab pipeline where it read GitHub's
Code Scanning and Dependabot pages up to 6.3.3. Step 12's commit rule is out of
date as well: since 24 September 2026 commits are made as Christopher
Holloway, the identity of the GitLab account Progressiverobot; from 14
September 2026 up to and including 6.3.4 no approval was required, so a tree that
had passed the gate landed on master by fast-forward, with no pull request;
and from the first change after 6.3.4 every change, a release's included, lands
through a merge request that the other maintainer approves before the owner
merges it by fast-forward, its pipeline green (GOVERNANCE.md, Review). A batch
lands that way with python3 build/land-via-mr.py batchN (written on 26
September 2026; none has landed yet), which refuses a merge request without that
approval unless the owner overrides it for one landing (--land-without-approval "<reason>"), and every commit it lands is signed off (git commit -s;
CONTRIBUTING.md, "Merge requests"). Until the first such landing, a tree that has
passed the gate is pushed to master directly.
From 6.3.6, releases pause. 6.3.6 is the last release for the time being. Security releases are still made, until 30 September 2027 (SECURITY.md, "While releases pause"), in the way A security release during the pause describes below.
For 6.3.5 onwards. Written on 26 September 2026 and not yet run: the first
release made this way is also the first test of it, and
hmailserver/docs/ContinuousIntegration.md ("The release") lists what only that
run can show and the one-time steps the owner takes first. The jobs are in
.gitlab-ci.yml, and build/check-release-chain.py holds them to what a server
built after 6.3.3 needs.
Before the first release, and whenever the project's members or settings
change, check the protected tag rule (Settings, Repository, Protected tags):
v*, allowed to create: Maintainers, and nobody else. Every server built after
6.3.3 trusts a bundle signed by any pipeline of a v tag of this project,
whatever .gitlab-ci.yml that tag's commit has, so whoever can push such a tag
can sign a release the servers accept. Nothing in the pipeline can check this.
Release tags are created by Christopher Holloway, as Progressiverobot, alone
(the owner's decision of 26 September 2026, GOVERNANCE.md). The protected tag
rule cannot say so on GitLab's free tier - it names a role, and Maintainers
include others - so the release job holds what it can: it reads
.gitlab/allowed_signers as master has it, fetched by name, never as the
tag's own tree has it; it refuses every tag while that list holds any number of
keys but one; it requires the tag's signature to be that key's, by its
fingerprint; and it requires the tagged commit to be on master. These checks
run as the tagged commit has them, so a tag on a commit that is not master's
could carry a .gitlab-ci.yml or a build/ci/release-chain.py of its own
without them: they stop a mistake and a tag pushed without the owner's key.
Against a hostile commit, the protected tag rule is what holds for the Sigstore
signature every server checks: any pipeline of a protected v* tag is given a
certificate naming that tag, which servers accept. The Azure credential made
for one tag at a time (Authenticode) holds the
installer's Authenticode signature alone, which a server checks only where
UpdateRequireAuthenticode=1 is set, and never on Linux. master's list is
itself only as safe as master, which Maintainers may push to until its push
rule becomes No one; after that a change to it reaches master only through a
merge request whose pipeline passed (hmailserver/docs/ContinuousIntegration.md,
"Landing on master").
-
Steps 1 to 10 below, as written, with one change: the release notes are the version's section of
CHANGELOG.md, headed## [X.Y.Z](...) - <date>, committed before the tag, becauserelease-publishmakes the release's notes from it as the tag's own tree has it and refuses a version without one - a pre-release's too,## [X.Y.Z-rc1](...). The installer is not built by hand (step 11): the pipeline builds it, in bench150's checkout, and refuses to if that checkout has a change of its own to a tracked file, or a file git does not track where a build would take it in (build/ci/windows-installer.ps1says which). -
Tag the release on
master, annotated and signed with the owner's key, once the commit is on GitLab'smaster- where the release commit, with the version stamp and the notes, gets through its batch's merge request (python3 build/land-via-mr.py batchN), signed off like every other - and push the tag:git tag -s vX.Y.Z -m "hMailServer X.Y.Z" git -c gpg.ssh.allowedSignersFile=.gitlab/allowed_signers verify-tag vX.Y.Z git push gitlab vX.Y.Zreleaserefuses a tag whose commit GitLab'smasterdoes not have yet, and reads the key frommaster's.gitlab/allowed_signers, so a key changed in the tagged commit alone counts for nothing.A pre-release's tag carries a suffix,
vX.Y.Z-rc1(step 12 says why). The tag's pipeline runs every gate - the checks, both suites, the package jobs, the SBOMs - andwindows-installer, which builds the installer on bench150 afterwindows-gateand signs nothing. -
Start
releaseonce every job before it has passed, within three days of the tag's pipeline (linux-build's artifact is kept three days; retrylinux-buildotherwise). GitLab offers the button only when every job of.gitlab-ci.ymlthat can fail the pipeline has passed andstatic-analysis,semgrep,dependency-scanandsemgrep-sasthave finished, whatever they found; it does not wait forci-image-packagesorrepo-hygiene, which areallow_failure, or for the manualdb-matrix. Of the package jobs of.gitlab/ci/packages-*.ymlit waits for the two whose generic files the release carries -deb-ubuntu26.04-arm64, the generic arm64.deb, andrpm-fedora44-aarch64, the generic aarch64.rpm- with their SBOM jobs and their install jobs, which install and run each package in an AArch64 container under qemu-user; forrelease-packages(.gitlab/ci/release-packages.yml), which waits in turn for every other distribution release's.deband.rpmbuild and its install job, both AppImages and their test jobs,appimage-runtime-sources(the source of the libraries linked into the AppImages' runtime) and the source tarball, and gathers those files, each but the runtime's sources with an SBOM; and forhelm-chart-package, the chart. (Release may need fifty jobs at most, GitLab'sci_needs_size_limit;release-packageswaits for forty-two, forty of them jobsreleasedoes not need itself.) It does not wait for the Windows packages, whose installers no release carries: the release's installer iswindows-installer's. It reads the four scans' reports first (build/ci/security-gate.py) and refuses while one did not finish, or found somethingSECURITY.md's policy counts ("Before a release") that no baseline and no entry of.gitlab/security-exceptions.ymlaccepts. Fix the finding, which takes a new tag on the fixed commit, or have the owner accept it in that file onmaster, with a reason and an expiry, and retryrelease: the job readsmaster's copy of the file, never the tagged tree's. It refuses, naming why, a tag that is lightweight, moved to another commit since the pipeline started, on a commitmasterdoes not have, or not signed by the one keymaster's.gitlab/allowed_signerslists (and every tag while that list holds more than one); aVersion.hthat does not say the tag's version, a cosign image that is notgcr.io's pinned by digest, a missing Azure setting, a missing file, a file unlike the sums its build job wrote, a compiled file without an SBOM that describes it, and a source tarballbuild/check-source-tarball.pydoes not take for this commit. It also refuses when the packagehmailserver/X.Y.Zalready holds one of the release's files with other bytes, or the installer or a bundle at all: those two are made by the signing jobs after it, and a second signing never makes the same bytes (a new timestamp, a new certificate). And it counts what GitLab and Pages will take before anything is signed: every link of the release GitLab must accept (adirect_asset_pathof at most 128 characters of letters, digits,_ . - /), and the update feed's site with the release in it -_redirects, with the apt and dnf repositories' rules, under the 1,000 rules and 64 KiB Pages reads, andreleases.jsonunder the 4 MiB a server reads, the repositories kept aspackage-repos'--keepkeeps them - and says the counts. Nothing has been signed or sent when it refuses.Before starting it, compare the line
hMailServer.exe <SHA-256>thatwindows-installerprinted with the hash step 8 measured and the notes give. The installer carries that executable, built in bench150's checkout; a different hash means bench150's compiler, Windows SDK or libraries are not the ones step 8 used, and the notes would name an executable the release does not ship. Bring bench150 to that toolchain and retrywindows-installerfirst (ReproducibleBuilds.md). -
release-authenticode,release-sbom,release-signandrelease-verifyfollow by themselves.release-sbommakes the signed installer's own SBOM and the statement of the release's SLSA v1 provenance, which names every file by its SHA-256; the x86-64.deb's and.rpm's SBOMs come fromlinux-build, the generic AArch64 ones' fromdeb-ubuntu26.04-arm64-sbomandrpm-fedora44-aarch64-sbom, and every other package's, both AppImages' and the tarball's fromrelease-packages, and every compiled file goes out with its<file>.cdx.json(SECURITY.md, "Software bills of materials"). From 6.3.6 a release is fifty-seven files, each with its bundle: the installer; the generic.deband.rpmfor x86-64 and for AArch64; a.debfor Debian 12 and 13 and Ubuntu 24.04 and an.rpmfor Fedora 44 and 43, EL 10 and 9, openSUSE Leap 16.0 and Tumbleweed, each for both, eighteen; the two AppImages; the source of the libraries linked into their runtime,hmailserver-X.Y.Z-appimage-runtime-sources.tar.gz, which the LGPL-2.1 and the GPL of two of them ask for and each AppImage names (hmailserver/docs/PackagesAppImage.md, "Licences"); the source tarball; the Helm chart; the sums of every Linux file, the runtime's sources and the chart; the twenty-six SBOMs of the compiled files and the tarball, and the tree's two. Each primary file's bundle goes out a second time as<file>.sigstore.json, andhmailserver-X.Y.Z.intoto.sigstore.jsonis the provenance, signed as the pipeline withcosign attest-blob: 146 links in all.release-signfinds every file in the provenance with cosign, andrelease-verifyholds the provenance and the copies to the files. Readrelease-verify'sverification.md: the identity must behttps://gitlab.com/Progressiverobot/hmailserver//.gitlab-ci.yml@refs/tags/vX.Y.Z, or, once the project has moved to the group,https://gitlab.com/hmailserver/hmailserver//.gitlab-ci.yml@refs/tags/vX.Y.Z. Note the repository id it gives: until one release signed before the move shows86730559, the project does not move (hmailserver/docs/UpdateFeed.md). -
The installer smoke test, on the signed installer: download
release-signed/fromrelease-sign's artifacts to the VMware host and runbash build/ci/installer-smoke-run.sh <the previous release's installer> release-signed/hMailServer-X.Y.Z-x64.exe, thenbash build/ci/installer-smoke-run.sh release-signed/hMailServer-X.Y.Z-x64.exeon its own, a new installation, which is where the secure defaults are checked (hmailserver/docs/SecureDefaults.md) (hmailserver/docs/ContinuousIntegration.md, "The installer smoke test"). Both must pass before the next step. -
Start
release-publish, as the owner. The job uploads and creates the release with itsCI_JOB_TOKEN, which acts with the permissions of whoever started it, and the package protection rules let only an Owner push to the packagehmailserver: started by anyone else, its uploads are refused (hmailserver/docs/ContinuousIntegration.md, "What waits for the owner"). It uploads the release's 146 files - the fifty-seven, their bundles, the.sigstore.jsoncopies and the provenance - to the packagehmailserver/X.Y.Z- refusing, before it sends anything, a compiled file whose SBOM is missing or describes other bytes, a copy that is not its bundle, a provenance that does not name every file, a link GitLab would refuse, a site Pages or a server would not read whole, and a name the package holds with other bytes, and not sending again a file it holds with the same bytes - reads every record of each name back and holds it to the digest that was signed, creates the release with a link per file named after it, and checks that the feed the API now gives offers the release to Windows servers, to Debian and RPM servers on x86-64 and AArch64, and to the AppImages.update-feedthen runspagesonmaster. Check the site:python3 build/generate-update-feed.py --check --site https://updates.progressiverobot.comThe container image is pushed by hand, from this same pipeline, once the maintainers have set the project's CI/CD variable
HM_PUBLISH_IMAGEto1- not before the project has moved to the grouphmailserver(hmailserver/docs/ContainerImage.md, "Publishing"). Startcontainer-image-deb, which the pipeline shows as waiting (it refuses, exit 3, while the variable is not1; start it again once it is): it takes the release's.deband its SBOM from the published release and verifies both against their Sigstore bundles. The rest follow it:container-imagebuilds the image from that.deband pushes:X.Y.Z, and for a release without a suffix:X.Yand:latest;container-image-sbommakes its SBOM;container-image-signsigns it by digest as the same pipeline and attests the SBOM to it;container_scanningscans it; andcontainer-image-startstarts it beside PostgreSQL and asks it for SMTP and the REST API. Readcontainer-image-signed/verification.txt, the scan's report and the start test's log. A check that fails after the push leaves tags naming an image that did not pass, which the job lists: delete them. -
The package managers (step 13) are still by hand: the manifests job was not ported.
The rehearsal. Every protected batch* branch's pipeline rehearses steps 3
to 4 (.gitlab/ci/release-rehearsal.yml): release-rehearsal collects every file
as release does, from the same jobs - the version is Version.h's, and the x64
installer windows-packages-x64's, built under its commit-stamped name, since
windows-installer runs for a v* tag alone - and counts what GitLab and Pages
would take; release-rehearsal-sign signs every file, makes each copy and attests
the provenance with Sigstore as the branch; release-rehearsal-verify holds every
SBOM, copy and the provenance to the files, and has the server's own verifier read
each bundle and refuse it at the identity. Servers trust v* tags alone, so what a
rehearsal signs installs nowhere, and it publishes nothing: no job of it uses the
job token GitLab gives every job, and release-chain.py refuses --rehearse with
publish. What it cannot rehearse is the tag's own checks, the security gate,
the registry and Authenticode. A rehearsal that fails is a release that would fail: mend it before
the tag.
A tag is spent once here too. Before release-publish, a job that failed for
a reason outside the tree - a setting, a tool on bench150, the network - is
retried at the same tag once the cause is put right. A fault in the tree needs a
new commit and so a new version. A release-publish that stopped part-way, with
some files uploaded, is finished by retrying release-publish in the same
pipeline, which sends only what is not up yet; not by starting release again,
which refuses once the installer or a bundle is in the registry, since signing
again would make other bytes under the same names. After release-publish, a
release that is wrong is corrected by the next version, not by editing this one:
servers may already hold its files.
The pipeline signs every file with Sigstore and carries no SSH signature: the
key that signs the release tags is the owner's, on his own machine, and no
GitLab job can hold it. A .sig of the sums file is for a release made by hand.
From 6.3.4, a release built and published by hand - 6.3.4 itself, made after
GitHub's suspension and before the release jobs above existed, or any later one
made outside the pipeline - carries hmailserver-<v>-SHA256SUMS.txt, the
<sha256> <name> line of every file of the release but itself and its .sig, and
hmailserver-<v>-SHA256SUMS.txt.sig, an SSH signature of it made with the key
that signs the release tags: the one key .gitlab/allowed_signers lists, under
the principal christopher.j.holloway@outlook.com. It stands where the
pipeline's Sigstore bundles would. Once the sums file is written, and before
anything is uploaded, sign it with the tag's key and check the signature
against the tag's own .gitlab/allowed_signers:
ssh-keygen -Y sign -f ~/.ssh/id_ed25519 -n file hmailserver-<v>-SHA256SUMS.txt
git show v<v>:.gitlab/allowed_signers > allowed_signers
ssh-keygen -Y verify -f allowed_signers -I christopher.j.holloway@outlook.com -n file -s hmailserver-<v>-SHA256SUMS.txt.sig < hmailserver-<v>-SHA256SUMS.txt
sha256sum -c hmailserver-<v>-SHA256SUMS.txt
The namespace is file, not git's git, so a tag signature cannot be passed
off as a signature of the sums, or the other way round. Both files are
uploaded and linked like every other file of the release. SECURITY.md,
"Verifying a release", gives users the same two commands.
From 6.3.6 no feature release is made, but a confirmed vulnerability still ships in a release: 6.3.6 with fixes, as 6.3.7, 6.3.8 and so on. Which versions are supported, until when, and what gets a release is in SECURITY.md, "While releases pause" (the maintainers' decision of 29 September 2026). A security release is made by the tag's pipeline, as in The release on GitLab, with the steps of Order of operations below it. What differs is the order in which things become public, and the steps only the owner can take.
Before starting, check what the release depends on is still valid: the table in SECURITY.md, "What must stay valid for a security release". In particular, check four things:
- the findings of
.gitlab/security-exceptions.ymlthat expire before the release (298 of them on 26 and 27 March 2027) have been read again, or the release job refuses; - the Artifact Signing identity validation has not lapsed (the Azure portal);
- linix and bench150 are up and online on GitLab
(
hmailserver/docs/ContinuousIntegration.md, "The runners"); - the project's path, which the federated credential's subject names:
Progressiverobot/hmailserveruntil the move into the group,hmailserver/hmailserverafter it.
-
Fix it without pushing. Write the fix and its regression test, which must
fail against the build before the fix. Then run steps 2 to 9 of
Order of operations by hand, on the maintainers'
machines: the Windows suite on a bench, and the Linux build and suite on
linix by hand (
build/ci/linux-build.sh,build/ci/linux-suite.sh). Step 8c's fuzz run may cite the previous minor's run when no fuzzed parser changed. Nothing is pushed yet: the repository is public, and the fix is visible from the moment it is. -
Write the notes: the version's
CHANGELOG.mdsection, headed## [X.Y.Z](...) - <date>, committed with the stamp of step 7. The section says what was fixed, names the confidential issue, and credits the reporter. It does not say how to exploit the flaw, because it is public from the push, about a day before the release. -
Land it, with
python3 build/land-via-mr.py batchN: the batch's branch pipeline runs every gate, and Zain Ul Abidin approves the merge request. Owner: if waiting for that approval would take the fix past its disclosure window, land it with--land-without-approval "<the issue and the date it is due>". The change is then reviewed on its merge request afterwards (GOVERNANCE.md, Review). - Owner: the federated credential for the tag, made before the tag is pushed, as On GitLab, from 6.3.5 step 1 says. Use the project's path of that day in the subject.
-
Owner: the tag. Sign it with the key in
.gitlab/allowed_signers, check it, and push it (step 2 of The release on GitLab). No one else holds that key, andreleaserefuses a tag signed by any other. -
Owner: start
releaseonce the tag's gates have passed. The owner is the only person in the project with the Maintainer role, which a manual job on a protected tag needs (the project access tokenlaptop-gitis an Owner too: SECURITY.md, "What must stay valid for a security release").release-authenticode,release-sbom,release-signandrelease-verifythen follow by themselves. - The installer smoke test, by hand, on the signed installer (step 5 of The release on GitLab), with the previous release and on its own.
-
Owner: start
release-publish. Only an Owner's job may upload to the packagehmailserver.update-feedthen brings the site up to date. Check it withpython3 build/generate-update-feed.py --check --site https://updates.progressiverobot.comandpython3 build/check-atom-feed.py --site https://updates.progressiverobot.com. -
Owner: remove the federated credential (
az ad app federated-credential delete, On GitLab, from 6.3.5). -
Disclose. Make the confidential issue public. Request the CVE ID from it,
if that has not been done, and quote it on the issue. Answer the reporter,
and announce the release. The update feed carries the release to every
server whose live update is on. A server from 6.2.28 to 6.3.3 still needs
the one
UpdateFeedUrlline (hmailserver/docs/UpdateFeed.md).
If Authenticode cannot be had in time, for example because the identity
validation has lapsed, the pipeline cannot publish. release-sbom, and every
job after it, waits for release-authenticode. The fallback is
A release made by hand, as 6.3.4 was. Its sums are
signed with the tag's key, and it carries no Sigstore bundle. No server installs
it by live update, and build/generate-update-feed.py publishes it as the
stable release only once UNSIGNED_BY_DESIGN names it. Say so in the notes, so
that administrators upgrade by hand.
Every box with a thick border is a gate: something that has stopped a release, or should have. A failure anywhere after step 7 sends you back to step 1, because the version is already stamped and the run that proves the binary is only valid for that binary.
flowchart TB
F["1. Freeze the code"] --> REV["2. Adversarial review of the<br/>complete diff - BEFORE stamping"]
REV --> FIX["3. Fix what survives.<br/>Every fix gets a negative-control test<br/>that FAILS on the pre-fix binary"]
FIX --> PF["4. wsl --shutdown if anything runs,<br/>then build/preflight-tests.ps1 -Clean<br/>and restart the service"]
PF --> RM["5. build/check-roadmap.ps1<br/>tick boxes vs section counts vs contents"]
RM --> DB["6. build/check-db-scripts.ps1<br/>+ build/check-schema-versions.ps1 (pwsh 7)"]
DB --> STAMP["7. Version stamp, eleven files:<br/>Version.h x3, section_setup_64.iss,<br/>seven .csproj, PKGBUILD, a lock file -<br/>then check-linux-version-stamp.sh<br/>and git grep the old version"]
STAMP --> BUILD["8. Build everything at the stamped version,<br/>server first: build.ps1 makes the COM wrapper<br/>(build/generate-com-wrapper.ps1) from the<br/>type library it has just built"]
BUILD --> REPRO["Second clean Release build.<br/>SHA-256 must match the first"]
REPRO --> ASSERT["8b. Full suite on the<br/>-Asserts build. Expect no HM6364.<br/>Then rebuild plain Release"]
ASSERT --> FUZZ["8c. Timed fuzz run on the release source<br/>30 minutes per harness"]
FUZZ --> GATE["9. Full regression suite on the<br/>STAMPED binary. Nothing skipped.<br/>Any later change voids it"]
GATE --> NOTES["10. Release notes - every claim<br/>checked against the diff"]
NOTES --> INST["11. ISCC on hMailServer64.iss.<br/>Never run the installer here"]
INST --> SHIP["12. Land on master, signed annotated tag;<br/>up to 6.3.3: draft release, SBOM, sign, publish<br/>on GitHub; from 6.3.5: the tag's GitLab pipeline -<br/>release, sign, verify, smoke test, publish"]
SHIP --> PM["13. The package managers,<br/>once the release is published -<br/>by hand since the GitHub workflow"]
PM --> LOOP["14. Close the loop on every issue"]
style F stroke-width:3px
style REV stroke-width:3px
style PF stroke-width:3px
style RM stroke-width:3px
style DB stroke-width:3px
style REPRO stroke-width:3px
style ASSERT stroke-width:3px
style FUZZ stroke-width:3px
style GATE stroke-width:3px
| Gate | Script or action | What it caught, at least once |
|---|---|---|
| 2 | Human review, per dimension, findings verified by skeptics | The 6.2.15 review found a BDAT truncation defect and a fix that turned transient file locks into permanent mail loss — after the installer was built |
| 3 | Negative-control test | One of the 6.2.15 abort tests passed on both builds until it was strengthened with session-count assertions |
| 4 | preflight-tests.ps1 |
A stale ERROR log from an aborted run fails 100% of the next run's tests in fixture setup |
| 5 | check-roadmap.ps1 |
Nine sections of Roadmap.md had drifted between three hand-edited restatements of the same 750 numbers |
| 6 | check-db-scripts.ps1 |
6.2.22-pre4 shipped an installer whose database could not be created at all; the only symptom was a service that started and did not listen |
| 6 | check-schema-versions.ps1 |
Missing until 6.2.23 — proves the upgrade chain is contiguous, forward-only and present for all four backends |
| 8 | Two clean builds, same SHA-256 | A mismatch means something started embedding a timestamp or a path again despite /Brepro, /d1trimfile, /pdbaltpath and OPENSSL_NO_FILENAMES
|
| 8b |
-Asserts build, HM6364 |
An assertion violation fails the test that provoked it and names the expression, file and line |
| 8c | fuzz\run-fuzz.ps1 |
A crash, hang or violated assertion is a release blocker: minimise, fix, add the input to fuzz\regression, restart at step 1 |
| 9 | The full suite on the stamped binary | The whole point: the verdict is about this binary, and any change after it voids the run |
-
Freeze the code. No fixes land after this point without restarting at step 2.
-
Adversarial review of the complete diff — independent reviewers per dimension (delivery paths, protocol handling, UI truthfulness vs. code, docs claims vs. code), each finding verified by skeptics instructed to refute it. This happens before version stamping, not before tagging: the 6.2.15 review ran after the installer was built and both blockers it found (a BDAT truncation defect and a fix that converted transient file locks into permanent mail loss) forced rebuilds and a re-run of the full suite. Same review, an hour cheaper, if run first.
-
Fix what survives review; each defect fix gets a negative-control test. Build the pre-fix binary and confirm the new test fails against it. A test that passes on both builds proves nothing — one of the 6.2.15 abort tests did exactly that until it was strengthened with session-count assertions.
-
Pre-flight the bench: first
wsl -l --running, andwsl --shutdownif anything is up. With mirrored networking a Linux server or test run left behind inside WSL holds the suite's ports invisibly - the Windows TCP table shows nothing - and the pre-flight probes only the TLS fixtures' twelve, so it passes. An orphaned Linux bench cost the first 6.3.1 assertion gate 24 errors this way; the Linux bench is the VM now, not WSL, for this reason. Thenbuild\preflight-tests.ps1 -Cleanand restart the service, every time: a completed suite leavesPreferredHashAlgorithm=4in the ini (a fixture restores the default by writing it rather than removing the key), so the next pre-flight fails until it is cleaned, and an aborted run leaves a deliberate scanner error in the ERROR log that fails 100% of the next run's tests in fixture setup, and the TLS fixtures' twelve extra ports behind, which the pre-flight checks. Gate on its exit code rather than reading its output: a chain that started the suite after a failed pre-flight did exactly that once. -
Check the roadmap against itself:
build\check-roadmap.ps1. It reconciles every tick box inRoadmap.mdagainst the per-section counts and the contents table, because three hand-edited restatements of the same 750 numbers drift — nine sections had drifted when the check was written. -
Check the database scripts build a database:
build\check-db-scripts.ps1, run withpowershell.exeand notpwsh- SQL Server Compact's managed provider cannot load its native components under .NET on PowerShell 7, which fails as "Unable to load the native components ... of version 8876" and says nothing about the scripts. It creates a throwaway SQL CE database fromCreateTablesMSSQL.sqlusing the same splitting rules the server uses, because nothing else here does - the regression bench's database is upgraded out of band, so no local test takes the CREATE path a fresh install takes. 6.2.22-pre4 shipped an installer whose database could not be created at all, and the only symptom was a service that started and did not listen.Run
build\check-schema-versions.ps1beside it (pwsh 7, not Windows PowerShell 5.1, where it dies inMeasure-Object -Property To). It walks the registered upgrade chain and proves it is contiguous and forward-only, and that every step is present for every backend. That matters most on exactly the kind of release this checklist keeps being used for - one that moves the schema several steps past the last stable - and it was missing from this step until 6.2.23. -
Version stamp, twelve files. The Windows nine:
Version.h(version, numeric, build),section_setup_64.iss, and all seven.csproj<Version>values. Then three outside the Windows build:-
hmailserver/source/Tools/Cli/HmailServer.psd1-ModuleVersion, the PowerShell module's version on the PowerShell Gallery. A data file cannot readVersion.h, so it is written;build/check-cli-packages.pyfails thecheckersjob while it differs. The PyPI packagehmailserver-cliis not on this list:build/ci/cli-packages.pytakes its version fromVersion.hwhen it builds it (CommandLinePackages.md). -
hmailserver/source/Server/platform/packaging/PKGBUILD-pkgver, which is also the tag the PKGBUILD fetches. It cannot be derived:makepkgparses the PKGBUILD as a shell script and never runs CMake. -
hmailserver/source/Tools/ImportTool.Tests/packages.lock.json- the entry for the project's own version. Regenerate it (dotnet restore --force-evaluateon that project) rather than editing it by hand. Nothing enforces this one. Measured on 10 September 2026:dotnet restore --locked-modewith a stale project-reference version exits 0, because locked mode validates the package graph and not project references - so a stale entry ships a lock file that lies about the tree, and this step is the only thing that catches it.
hmailserver/source/Server/CMakeLists.txtis not on the list, and this is the one line of this step worth reading twice: it used to be, and a stamp missed there produced Linux packages named at the wrong version, which the release jobs (build/ci/release-chain.py; the GitHub workflowsign-release.ymlup to 6.3.3) and the server's own update checker - all of which match those file names by exact equality - would simply never find. It now readsVersion.hwithfile(STRINGS)beforeproject(), so there is nothing there to stamp.Then run
build/check-linux-version-stamp.sh(Git Bash, WSL or the runner; it needs no toolchain, which is why thecheckersjob of.gitlab-ci.ymlruns it before anything is compiled, andlinux-buildagain before it packages). It proves Version.h agrees with itself, that the CMakeLists still derives rather than declares, thatpkgvermatches, and that no version literal has crept back into anything else underplatform/packaging/.Verify nothing else still carries the old version:
git grep <old-version>. What legitimately stays behind is prose of the form "new in 6.2.28", which names when something arrived and must not be moved forward. Insection_setup_64.isstheVersionInfoVersionfourth component stays0: the build number lives inVersion.hand the tag, and a build-only re-cut (the common case) must not have to touch the installer script or the seven.csprojfiles, whose versions are also<version>.0. -
-
Build everything at the stamped version:
build.ps1 -Configuration Release,build-tools.ps1 -Configuration Release, ControlPaneldotnet publishto itspublish\folder (build-tools does not cover it),build-tests.ps1. Confirm the stampedFileVersiononhMailServer.exeandpublish\hMailCP.dll.The COM wrapper the tools compile against (
source\Tools\Interop\ Interop.hMailServer.dll) is not in git since 11 September 2026:build.ps1generates it from the type library it just built, andbuild-tools.ps1generates it if it is missing or stale, both throughbuild\generate-com-wrapper.ps1, which rewrites it only when the type library changed. So the order above - server, then tools - is what keeps the shipped wrapper current after an IDL change, and there is nothing to regenerate by hand and no manifest hash to update. An interface-ordering fix still has to land BEFORE the server build that the tools are built after, for the same reason as ever: the wrapper freezes the vtable layout of the type library it was made from.Then prove the build is still reproducible: build Release a second time from clean (
build\build.ps1 -Configuration Release -Clean) and compare the SHA-256 ofhMailServer.exewith the first; then build the same tree once more from clean in a second checkout at another path and compare that too. The version stamp is not committed yet, so make the checkout fromgit stash create, which records the working tree as a commit and changes nothing in it ($tree = git stash create; if (-not $tree) { $tree = 'HEAD' }, thengit worktree add --detach ..\hm-repro $tree), and runbuild\get-installer-binaries.ps1 -SystemOnlyin it, as in any new clone. All three must be identical - /Brepro, /d1trimfile (the checkout's root and the libraries' root), /pdbaltpath and OPENSSL_NO_FILENAMES in the project make the executable a function of the source, the toolchain and the libraries, and a mismatch means something has started embedding a timestamp or a path again. Two builds in one directory cannot show a path: until 26 September 2026 they were identical while a checkout elsewhere built another executable (ReproducibleBuilds.md). Put the hash in the release notes' verification section so anyone with the same toolchain (v145, Windows SDK 10.0.26100) and library layout can check the published binary came from the published source. The two builds in the release tree rewrite thehMailServer.exestep 9 tests (build.ps1turns the project's build events off, so neither stops or starts the service), so do this before step 9, never after; the build in the second checkout writes nothing the release uses.The Linux packages keep the same promise by a different mechanism, and what is proven is narrower, so it is stated narrowly.
CMakeLists.txtpasses-ffile-prefix-map=<source>=.so no absolute path reaches the binary, and thelinux-buildjob of.gitlab-ci.yml(build/ci/linux-build.sh, as the Linux build workflow did on GitHub up to 6.3.3) exportsSOURCE_DATE_EPOCHfrom the commit's own date, which is what__DATE__, the archiver,dpkg-debandrpmbuildstamp instead of the clock. Two builds of the same tag in the same image therefore produce the samehmailserverbinary. What is not pinned is what the image holds: its Ubuntu packages are the archive's of the day it was built (on GitHub,ubuntu-latestmoved the same way), and a compiler or a Boost that moved between two builds changes the binary legitimately. The job log records the versions it built with, and the release notes say "reproducible on the runner image of the day" and give the binary's SHA-256 from that log, rather than claiming what the MSVC line above can claim. Measured on 8 September 2026: commit 8926f5c3f built twice on the hosted runners - the two attempts of run 34282935758, forty-four minutes apart, on two runner allocations - and every job's binary hashed the same both times (x86-64 clang, x86-64 GCC, AArch64 clang). Since 26 September 2026 the packages are reproducible too -CMakeLists.txtfixes their directories' and the.deb's maintainer scripts' modes andrpmbuild's clock and host name, andlinux-build.shits umask - and thelinux-reprojob checks all three for every tag beforereleasecan run (build/ci/linux-repro.sh): it builds the commit a second time withlinux-build.sh, from a copy of the tree at another path with other file modes, in another build directory, started under another umask and in another time zone, and requires the binary, the.deband the.rpmto be byte for bytelinux-build's (ReproducibleBuilds.md). The AArch64.deband.rpma release carries from 6.3.6 are the package jobs', built once and not compared.
8b. Full regression suite on the assertion build, first. Build with
build\build.ps1 -Configuration Release -Asserts - the same source, with
every HM_ASSERT kept and a violated one reported as HM6364 in the ERROR
log instead of compiled out - and run the whole suite on it. The ERROR log
is checked before each test, so a violation fails the test that provoked
it and names the expression, file and line. Expect none. Then rebuild plain
Release (step 8) before step 9: the assertion build is the dynamic-analysis
build and is never the binary that ships or is hashed.
8c. Timed fuzz run on the release source — required for every minor
release. On the build from step 8: fuzz\run-fuzz.ps1 -Target mime_message_fuzzer -Minutes 30, and the same for each other harness
listed in hmailserver/docs/Fuzzing.md. A crash, a hang or a violated
assertion is a release blocker: minimise it, fix it, add the input to
fuzz\regression, restart at step 1. Record the harnesses, the duration
and the execution count in the release notes' verification line. A patch
release may cite the previous minor's run when none of the fuzzed parsers
changed; anything else runs again.
-
Full regression suite on the stamped binary (
build\run-tests.ps1, with no-StopOnError) — every test, nothing skipped. If anything changes after this run, the run is void: rebuild and re-run. Never abort a run; if one must be stopped, expect step 4 to fail and clean up before trusting any result. At this point the reports of the commit's pipeline - dependency-scan, static-analysis, semgrep and semgrep-sast (hmailserver/docs/ContinuousIntegration.md, "Security scanning") - passbuild/ci/security-gate.py, which holds them to the thresholds inSECURITY.md("Before a release") and to.gitlab/security-exceptions.yml, or the release waits. The release job runs the gate itself; a release made by hand runs the scans on linix against the release's commit and the gate over what they wrote (python3 build/ci/security-gate.py --artifacts <dir>). Up to 6.3.3 these were GitHub's Code Scanning and Dependabot alert pages.Now: the first pipeline of 26 September 2026, on master
40c7d3e0c, ran dependency-scan, static-analysis and semgrep on the project's own runners, and all three failed, which they may do without failing the pipeline: GitLab refused the reports of two, and static-analysis and semgrep reported findings beyond their baselines (ContinuousIntegration.md). semgrep-sast came in the batch after it. In master's first full pipeline, 2886389460 on 27 September 2026, dependency-scan and semgrep-sast passed, and static-analysis (175 findings beyond its baseline) and semgrep (4) failed with secret_detection; batch41, the branch of 6.3.5, writes both baselines again over the release's tree and fixes the one finding of the four that was a defect (work item #21). No pipeline has run on a release tag yet, so for a release made by hand the scans are run on linix and gated as above. -
README release notes — every claim checked against the diff. "Fixed" means reproduced-then-fixed or negative-control-tested; anything else is described as hardening or diagnostics. Unfixed known issues are named as unfixed.
-
Installer: ISCC on
hMailServer64.iss. Three prerequisites the script does not check:$env:hMailServerLibsmust point at the library tree,build\get-dotnet-runtime.ps1must have populatedinstallation\DotNet\with the desktop runtime the installer carries - the one releasehmailserver/docs/third-party-binaries.jsonpins, checked against the SHA-512 Microsoft publishes for it (-Verifychecks the file in place, and refuses an older download left from before the pin) - andbuild\get-installer-binaries.ps1must have placed the third-party binaries
- the MSVC runtime gathered from Visual Studio, the ADO type libraries copied
from Windows, and 7-Zip, the MariaDB client and the SQL Server Compact
runtime fetched from the
build-inputs-1release - none of which is in git since 11 September 2026 (run it with-Verifyto check; every file is matched againsthmailserver/docs/third-party-binaries.json). Never run the installer on the dev machine — validation is the installer smoke test, which installs it on a throwaway machine and must pass before the release is published: on GitLab, step 5 of The release on GitLab (hmailserver/docs/ContinuousIntegration.md, "The installer smoke test"). Up to 6.3.3 it was the GitHub workflowinstaller-smoke.yml(in the git history atv6.3.3), dispatched by hand on a hosted runner once the draft release carried its installer:gh workflow run "Installer smoke test" -f release_tag=vX.Y.Z.
Now: build\get-installer-binaries.ps1 fetches the build-inputs-1 files
from the project's package registry on GitLab, where they were re-published
byte for byte, so a new machine can build the installer again.
12. History: how a release up to 6.3.3 was committed, tagged, published and
signed on GitHub, by the workflows that are in the git history at
v6.3.3. From 6.3.5, The release on GitLab
replaces this step from the tag on.
*Now:* since 14 September 2026 no approval is required, and since 24
September 2026 commits are made as Christopher Holloway, the identity of the
GitLab account `Progressiverobot`; up to 6.3.4 a tree that passed the gate landed on
`master` by fast-forward, with no pull request. From the first landing after 6.3.4 a
batch reaches `master` through a GitLab merge request, signed off, once somebody other
than its author has approved it, unless the owner overrides that for one landing, which
is recorded ([ContinuousIntegration.md](https://gitlab.com/hmailserver/hmailserver/-/blob/master/hmailserver/docs/ContinuousIntegration.md), "Landing on master").
`python3 build/land-via-mr.py batchN` makes that landing; the first merge request it serves is !1,
batch41's, for 6.3.5, and its branch pipeline is the gate the project's setting *Pipelines must
succeed* holds it to ([[Governance]], *Review*).
**Commit** (as chrisholloway5, no co-author trailers - history has been
rewritten once to remove them, and will be again). `master` is protected:
changes arrive by pull request with an approving review from someone other
than the last person to push, force-pushes and deletions are refused, and
an administrator's bypass exists for emergencies, not for the release flow.
So push the working branch, open the PR, have the other maintainer approve
it, and merge it with a rebase so the history stays linear and the commits
keep their own messages:
```
git push origin server-fixes-wave
gh pr create --base master --head server-fixes-wave --fill
gh pr merge --rebase # after the other maintainer's approval (GOVERNANCE.md, Review)
git pull --ff-only origin master
```
Then **tag** `vX.Y.Z` on master as an **annotated, signed** tag and push it
(tags matching `v*` are protected too: no deletion, no rewrite - a tag is
spent once):
```
git tag -s vX.Y.Z -m "hMailServer X.Y.Z"
git -c gpg.ssh.allowedSignersFile=.gitlab/allowed_signers verify-tag vX.Y.Z
git push origin vX.Y.Z
```
Signing is SSH-based (`git config gpg.format ssh` and `user.signingkey`
pointing at the public key, set once in the repository's config), and the
key must be listed in `.gitlab/allowed_signers` (`.github/allowed_signers`
until the move to GitLab) - the signing workflow
below refuses to sign anything for a tag that is lightweight or that does
not verify against that file, so an unsigned tag stops the release before
it has any assets. Every tag up to `v6.2.23-alpha1` was either lightweight or annotated but
unsigned; there was nothing to verify and nothing stopped a `v*` ref being moved.
A pre-release's tag carries a suffix - `v6.3.5-rc1`, never `v6.3.5` with
"Pre-release" in its title. The update feed and every server built after
6.3.3 tell a pre-release by that suffix alone, since neither the feed's flag
nor a title is the signer's word, and the feed does not publish a release
titled as a pre-release whose tag has none (docs/UpdateFeed.md).
Then publish **as a draft first** - this repository has
immutable releases enabled, so a published release refuses every further asset
upload and would be stuck with whatever it was created with:
```
# --prerelease ONLY for an alpha, beta or release candidate. A stable
# release must not carry it: the shipped update checker reads GitHub's
# "latest release" endpoint, which never answers with a pre-release, so a
# stable release left marked pre-release is invisible to every server in
# the field. If one is created that way, `gh release edit vX.Y.Z
# --prerelease=false` before publishing.
gh release create vX.Y.Z <installer> --draft \
--title "..." --notes-file <notes>
# The tag's own Linux run builds the six Linux artefacts - a .deb, an .rpm
# and an .AppImage per architecture - and its publish job attaches them and
# a SHA-256 sums file to this release itself. Watch it rather than
# downloading artefacts:
gh run list --workflow "Linux build" --branch vX.Y.Z
gh run watch <run-id>
# Authenticode, if a certificate has been arranged - see below. The job is
# part of "Sign release artefacts" and does nothing while the settings are
# absent, writing a notice instead.
gh workflow run "SBOM" -f release_tag=vX.Y.Z # SPDX + CycloneDX
gh workflow run "Sign release artefacts" -f tag=vX.Y.Z # LAST: signs what is attached
gh workflow run "Installer smoke test" -f release_tag=vX.Y.Z # green before publishing
# Expect: the installer, 2 .deb, 2 .rpm, 2 .AppImage, one SHA256SUMS.txt,
# 2 SBOMs, a .cosign.bundle AND a .sigstore.json (the same bytes, under the
# name OpenSSF Scorecard recognises) beside every one of them, and one
# hmailserver-vX.Y.Z.intoto.jsonl of SLSA provenance - THIRTY-ONE assets.
# Count them. This step exists because an artefact that failed to build
# goes missing quietly, and the release is immutable once published.
gh release view vX.Y.Z --json assets
gh release edit vX.Y.Z --draft=false # publish, now complete
```
**Linux packages: one release, every platform.** Pushing the tag started
the *Linux build* workflow, whose package jobs keep one `.deb` and one
`.rpm` per architecture as run artefacts for fourteen days. They join the
draft beside the installer, BEFORE the SBOM and signing steps, because
both act on whatever is attached when they run. Their names are as fixed
as the installer's: `hmailserver_<version>_amd64.deb`,
`hmailserver_<version>_arm64.deb`, `hmailserver-<version>-1.x86_64.rpm`
and `hmailserver-<version>-1.aarch64.rpm`. A Linux server's update checker
builds the one its own package manager and architecture would install and
matches it exactly, as a Windows server does the installer, so CPack's
names are uploaded as they are and never tidied. The signing workflow
lists which platforms a release carries and *warns* about a missing Linux
set rather than failing, because the Windows installer is what every
server in the field is waiting for and a Linux packaging failure must not
hold it back; a release that ships without them is a Windows-only release
and its notes say so. The AppImages are attached too, and are the one
asset here that is not for installing: an AppImage of a daemon is a way to
try the server without putting anything on the machine, and the build
script says so on its way out. The PKGBUILD is not a release asset at all -
it is built by the user's own machine from the tag.
**The installer's name is not cosmetic.** It must be exactly
`hMailServer-<tag without the leading v>-x64.exe`, with its `.cosign.bundle`
beside it. The update checker in every running server builds that name from
the tag and matches an asset on exact equality; a release named anything else
reports "a new version is available" and then "there is nothing to download"
to every installation in the field. This was broken once already, at
`v6.2.22-pre3`, whose installer was `hMailServer-6.2.22-x64.exe`. The signing
workflow now refuses a release that does not carry the expected name, so the
check happens before publication rather than after somebody notices.
Order matters twice over: the SBOMs have to be on before signing, because
cosign signs whatever is attached when it runs; and everything has to be on
before publication, because nothing can be added afterwards. 6.2.22-pre4 was
published straight away and ended up with an installer and no SBOM at all.
**A published release is immutable.** This repository has immutable
releases on: once published, a release's assets and tag cannot be added to,
changed or removed (the API answers 422 to an upload). So a signature, a
`.sigstore.json` twin or the provenance can only be attached before
publication, which is when the signing workflow attaches them; a release
that shipped before the twins and the provenance existed (6.3.1 and
earlier, and `build-inputs-1`) stays as it is, and OpenSSF Scorecard's
Signed-Releases check, which judges the five latest releases, climbs as
new releases replace them.
**The two `gh workflow run` lines are required, not belt-and-braces.** Saving a
draft does not start a workflow: GitHub does not deliver `release` events for
draft releases, which was measured here rather than assumed - creating the pre5
draft produced no run at all. The `release: created` trigger on both workflows
therefore only covers a release published without a draft, which is the path
that can no longer attach anything. Dispatching them by hand is the path that
works.
And a tag is spent once: a tag that has backed an immutable release cannot back
another, even after that release is deleted. There is no re-cutting a broken
release under the same version - it needs the next number.
-
History: the GitHub workflow
package-managers.yml, in the git history atfaca023d4; it was never ported to GitLab (hmailserver/docs/ContinuousIntegration.md, "From GitHub Actions to GitLab CI"), so the manifests are rendered and submitted by hand.The package managers, once the release is published and its installer signed. The Package managers workflow runs itself on
release: published: it downloads the installer the release actually attached, refuses it unless its Authenticode signature is valid, computes the SHA-256 from those bytes, renders the three winget manifests and the Chocolatey package from the templates inhmailserver\installation, validates them against Microsoft's published schemas and packs the.nupkg. The files are kept as an artifact of the run.Submitting them is deliberately not automatic until it has been armed once: a new package identifier is reviewed by a person at microsoft/winget-pkgs, so the FIRST submission is by hand.
hmailserver\docs\PackageManagers.mdis the walk - the fork, the token,wingetcreate submit, the Chocolatey API key - and says what to set (thePACKAGE_MANAGER_SUBMITvariable, theWINGET_TOKENandCHOCO_API_KEYsecrets) so that every release after that submits itself.The hash is computed there and never copied from a release note, because the signed installer is not the built installer: signing changes the bytes, and a package manager handing out a mismatched hash is a broken install for every user of it.
Now: the Package managers workflow was not ported to GitLab, so both halves of this step are done by hand;
check-package-manifests.pynow checks that the installer URL is a release's file in the project's package registry on GitLab (Contributing, The checkers). -
Close the loop: answer every issue the release resolves (and close them), update the ones it does not resolve saying so plainly.
Wiki addition, written on 8 September 2026 against the chain as it then ran on GitHub; the status note at the top says what has changed since, and step 12 above lists what a release carried from 6.3.1. From 6.3.5 a release is published by the tag's GitLab pipeline instead (The release on GitLab, above), and after 6.3.6, while releases pause, a security release is published the same way (A security release during the pause).
Step 12 is the part of the process with the least room to recover, because two GitHub behaviours combine: a published release refuses further asset uploads, and a tag that has backed an immutable release can never back another, even after that release is deleted. Get the order wrong and the fix is the next version number.
sequenceDiagram
autonumber
participant M as Maintainer
participant G as GitHub
participant S as SBOM workflow
participant C as Sign-release workflow
M->>G: git push origin server-fixes-wave
M->>G: gh pr create --base master --fill
M->>G: gh pr merge --rebase
Note over M,G: self-merge allowed, no reviewer required -<br/>rebase keeps history linear
M->>M: git pull --ff-only origin master
M->>M: git tag -s vX.Y.Z -m "hMailServer X.Y.Z"
M->>M: git -c gpg.ssh.allowedSignersFile=.github/allowed_signers verify-tag
M->>G: git push origin vX.Y.Z
Note over G: tags matching v* are protected:<br/>no deletion, no rewrite - a tag is spent once
M->>G: gh release create vX.Y.Z, the installer, --draft
Note over G: a DRAFT delivers no release event.<br/>Nothing starts on its own
M->>S: gh workflow run "SBOM" -f release_tag=vX.Y.Z
S->>G: attach hmailserver.spdx.json + hmailserver.cyclonedx.json
M->>C: gh workflow run "Sign release artefacts" -f tag=vX.Y.Z
C->>G: verify-tag against .github/allowed_signers
C->>C: refuse unless an asset is named exactly<br/>hMailServer-X.Y.Z-x64.exe
C->>G: cosign sign-blob --bundle for every asset
M->>G: gh release view vX.Y.Z --json assets
Note over M: expect installer + 2 SBOMs + 3 .cosign.bundle
M->>G: gh release edit vX.Y.Z --draft=false
Note over G: published - and now immutable
The order is forced twice over: the SBOMs have to be attached before signing, because cosign signs whatever is present when it runs; and everything has to be attached before publication, because nothing can be added afterwards. 6.2.22-pre4 was published straight away and ended up with an installer and no SBOM at all.
| Rule | Where it comes from | What it costs to get wrong |
|---|---|---|
| A published release refuses asset uploads (HTTP 422) | Immutable releases enabled on this repository | The release ships incomplete — an installer with no SBOM, or no signature |
| A tag is spent once | The same setting, plus the refs/tags/v* ruleset (deletion and non-fast-forward blocked) |
There is no re-cutting a broken release under the same version. It needs the next number |
A draft delivers no release event |
Measured, not assumed — creating the pre5 draft produced no run at all | The two gh workflow run lines are required, not belt-and-braces |
The asset must be named exactly hMailServer-<tag without the leading v>-x64.exe,
with its .cosign.bundle beside it. UpdateChecker in every running server builds
that name from the tag and matches an asset on exact equality, so a release named
anything else reports "a new version is available" and then "there is nothing to
download" to every installation in the field. That happened at v6.2.22-pre3, whose
installer was hMailServer-6.2.22-x64.exe under a -pre3 tag. The signing workflow
now refuses a release that does not carry the expected name, so the check happens
before publication rather than after somebody notices.
Anyone can check both halves without trusting this project's word for either. The releases are on GitLab now, carrying the same files, byte for byte, as when they were published on GitHub, so these checks work exactly as they did; nothing in them contacts GitHub:
# the tag was signed by the key in .gitlab/allowed_signers (.github/ until the move to GitLab)
git -c gpg.ssh.allowedSignersFile=.gitlab/allowed_signers verify-tag v6.2.28
# the installer is the blob the workflow signed, from this repository's OIDC identity
cosign verify-blob \
--bundle hMailServer-6.2.28-x64.exe.cosign.bundle \
--certificate-identity-regexp '^https://github\.com/Progressiverobot/hmailserver/' \
--certificate-oidc-issuer https://token.actions.githubusercontent.com \
hMailServer-6.2.28-x64.exe
Every release up to 6.3.3 was signed keylessly, through GitHub's OIDC identity, and recorded in Rekor; there is no long-lived private key to steal. Only GitHub Actions can issue that identity, so no later release can carry it; 6.3.4 carries no bundle - its sums file is signed with the release tags' SSH key instead (A release made by hand, above, and Security Policy, Verifying a release, for the two commands) - and Security Policy gives the identity the releases from 6.3.5 are to carry, from the project's GitLab CI, at its present path and at the group's it is to move to. What Sigstore does not give you is a SmartScreen-quiet download, because Windows does not read Sigstore bundles; that is Authenticode, which the installer has carried since 6.3.1 (see Authenticode below).
Two more things a reader can check for themselves:
-
The reproducible build. With the same toolchain (v145, Windows SDK 10.0.26100)
and the README library layout, a clean Release build of the tagged source produces a
hMailServer.exewith the SHA-256 printed in that release's verification section —9E89C1E3ABF4DD36560B0B5F3515BDA3DAB8B96F00EF35DA5376A9B60176BD15for 6.2.28. -
The SBOMs. SPDX 2.3 JSON and CycloneDX JSON are attached to every release from 6.2.3; up to
6.3.3 the native dependencies (OpenSSL, Boost, libpq) were merged in by
build/merge-native-dependencies-into-sbom.ps1, which then fails if any of their PURLs is missing. From 6.3.4 every compiled file - the installer, the.deb, the.rpm- also has an SBOM of its own,<file>.cdx.json, whose subject is that file by its SHA-256 (build/asset-sbom.py verifychecks one against its file; Security Policy, Software bills of materials).
- Prefer two small releases over one large one. 6.2.15 carried IMAP semantics, delivery changes, a connection-layer rewrite and a UI expansion in one tag; its worst defect lived in the interaction between two of those themes.
-
A fix to a shared layer needs a dependents audit. Before changing
behaviour in something like
TCPConnection, enumerate who depends on the old behaviour (the BDAT reads depended on "any error ends the session"). - The public record never overstates. If it is not reproduced and negative-control-tested, it is not "fixed" — say "hardened", "instrumented" or "still open". Credibility with reporters is the project's scarcest resource.
Every release asset is signed with cosign, keylessly, and that signature is what somebody who deliberately checks can verify. It is not what Windows reads. SmartScreen and the UAC prompt read Authenticode, which the Windows installer has carried since 6.3.1 (before that they showed an unknown publisher) - so the two are complementary.
Be clear what it buys, because it is not what everybody assumes. Signing does not remove the SmartScreen warning. Microsoft's own comparison puts a signed installer in the same row as an unsigned one - flagged as unrecognised until reputation accumulates - and reputation attaches to a file that does not change, which a new 80 MB installer every few weeks never is. What signing buys is two things that are real: the elevation prompt reads the publisher's name instead of Unknown publisher, from the first signed release; and an enterprise policy that refuses unsigned binaries outright stops being a wall. For a mail server, whose users are disproportionately administrators on policy-managed Windows, the second is the one that matters.
The release-authenticode job (build/ci/windows-authenticode.ps1, on bench150)
signs the installer with Azure Artifact Signing through SignTool and
Microsoft's Artifact Signing plugin, with an RFC 3161 timestamp from
http://timestamp.acs.microsoft.com, and holds no secret: the job's GitLab ID
token, with the audience api://AzureADTokenExchange, is what Microsoft Entra
ID accepts through a federated credential in place of a client secret. It stops
before sending anything while a setting is missing, naming it, and when Entra
refuses the token it prints Entra's own answer, which names the subject the
token carried. What the owner creates:
-
A federated credential for each release, made for its tag alone, on the app registration that holds the Artifact Signing Certificate Profile Signer role on the certificate profile (the one used for 6.3.1 to 6.3.4 will do), before the tag is pushed: issuer
https://gitlab.com, subjectproject_path:Progressiverobot/hmailserver:ref_type:tag:ref:vX.Y.Z- a GitLab ID token's subject for that tag, which Entra ID matches exactly - and audienceapi://AzureADTokenExchange. The portal has it under the app registration's Certificates & secrets, Federated credentials, Other issuer; or save this ascredential.json:{ "name": "gitlab-hmailserver-vX.Y.Z", "issuer": "https://gitlab.com", "subject": "project_path:Progressiverobot/hmailserver:ref_type:tag:ref:vX.Y.Z", "audiences": ["api://AzureADTokenExchange"] }az ad app federated-credential create --id <the app registration's application id> --parameters credential.jsonRemove it once the release is published (
az ad app federated-credential delete --id <application id> --federated-credential-id gitlab-hmailserver-vX.Y.Z): an app registration holds at most twenty, and one left in place would let another pipeline of the same tag sign. A pre-release's tag,vX.Y.Z-rc1, needs its own.Not a flexible federated credential matching
ref:v*(in preview on 26 September 2026), though it would save the step:v*matches every tag the protected tag rule lets a Maintainer push, and release tags are the owner's alone (The release on GitLab). A credential made for one tag, when the owner makes that tag, keeps the Authenticode signature to the owner's tags whatever the tagged commit carries, sincerelease's own checks run as the tagged commit has them. It does not hold the Sigstore signature, which any pipeline of a protectedv*tag is given and which is all a server requires unlessUpdateRequireAuthenticode=1is set.Setting the project's ID token subject to begin with its id instead of its path (the project's
ci_id_token_sub_claim_components,["project_id", "ref_type", "ref"], through GitLab's API) makes the subjectproject_id:86730559:ref_type:tag:ref:vX.Y.Z, which no rename or transfer can give to another project, and the credential's subject is then that. Sigstore does not use the subject, so this changes nothing for the bundles. -
Five CI/CD variables of the project (Settings, CI/CD, Variables), each protected, so that only a protected ref's pipeline - a
v*tag - reads them. None is a secret:AZURE_TENANT_ID,AZURE_CLIENT_ID(the app registration's application id),ARTIFACT_SIGNING_ENDPOINT(https://neu.codesigning.azure.net),ARTIFACT_SIGNING_ACCOUNTandARTIFACT_SIGNING_PROFILE. The pipeline needs no client secret; theAZURE_CLIENT_SECRETof the GitHub workflow has no counterpart here. -
The Artifact Signing Client Tools on bench150, for the machine, as an administrator. Installed on 26 September 2026, in
C:\Program Files\Microsoft\ArtifactSigningClientTools; winget's--scope machinefinds no installer for them, so the MSI is installed withmsiexecandALLUSERS=1(hmailserver/docs/ContinuousIntegration.md, "bench150", has the command).
The job then checks the signature is Valid, carries the timestamp, and left
the version resource as it was, before release-sign signs the same bytes with
Sigstore. What signing buys and what it does not is the same as below.
The authenticode job in sign-release.yml (the GitHub workflow, in the git
history at v6.3.3) signed the installer with Azure Artifact Signing - the
service formerly called Trusted Signing. The rest of this section is written as
it stood then. The job does
nothing at all until these exist. It is deliberately silent-but-visible: it
writes a notice on every release saying the installer is unsigned, and lets the
release proceed. It runs BEFORE the cosign job, which is not arbitrary: it
replaces the installer asset, and cosign has to sign the bytes that ship.
- A pay-as-you-go Azure subscription - free, trial and sponsored subscriptions are refused - with an Artifact Signing account and a certificate profile. Microsoft does the identity validation and holds the key: there is no certificate file to store, steal or expire in a drawer, and none of the 460-day reissue treadmill an owned certificate now carries. The account, its resource group and its subscription cannot be changed afterwards, so choose them as permanent.
- Repository secrets
AZURE_TENANT_ID,AZURE_CLIENT_ID,AZURE_CLIENT_SECRET, for an app registration holding the Artifact Signing Certificate Profile Signer role on that profile. The roles were renamed with the service and the old names do not resolve. Two more things the portal does not say: creating the identity validation needs the Artifact Signing Identity Verifier role on the account - Owner is not enough, because it is a data action, and without it the portal simply offers nothing to create - and the validation itself has no ARM resource type, so it is portal-only, while the certificate profile is scriptable (certificateProfiles, api-version 2025-10-13). - Repository variables
ARTIFACT_SIGNING_ENDPOINT,ARTIFACT_SIGNING_ACCOUNT,ARTIFACT_SIGNING_PROFILE. The endpoint is a full URI, not a bare host:https://neu.codesigning.azure.net, which is the action's own documented form. There is no UK region, and North Europe is the nearest of the sixteen the resource provider offers.
All six are required, and the job refuses a subset rather than signing with one: setting four of them and leaving two blank was, until the gate was rewritten, a release that failed at the Azure action and took the cosign job down with it.
Identity validation takes one to twenty business days and Microsoft states it cannot be expedited, so this is arranged once and long before a release rather than during one. It also has to be renewed, and signing stops if it lapses. It is an organisation validation against Companies House plus a one-off photo-ID check of the person applying; the verification email expires in seven days and cannot be re-sent.
The certificates this service issues live about seventy-two hours, which is why
timestamp-rfc3161 in the job is not optional however the Action's input is
marked: without a countersigned timestamp the signature stops verifying three
days later.
hMailServer 6.3.8, the latest release (2 November 2026, schema 6108) · AGPL-3.0-or-later · Repository · Mirror on GitHub · Report a documentation error (a GitLab issue naming the page)
Home — full index
Start here
1. Install and run
- Before You Install
- Installing hMailServer
- Installing on Linux
- Running in a Container
- Profiles and Environment
- The Control Panel
- The Control Deck
- Your First Domain and Mailbox
- Connecting a Mail Client
- The Webmail
- DNS for Your Domain
- Migration
2. Secure it
- Encryption and Certificates
- Database TLS
- Encryption for People
- Stopping Spam
- Stopping Viruses
- Security Hardening
- Secure Defaults
- The Service Account
- Secrets at Rest
- Sign-in and Identity
- Security Policy
3. Operate it
- Monitoring and Health
- The SNMP Agent
- Backup and Restore
- Message Storage
- Compliance and eDiscovery
- Troubleshooting
- Diagnosing Stalled Mail
- Relocating an Installation
- Upgrading hMailServer
- Upgrading Guide
- The Update Feed
- Migrating the Database Backend
- High Availability Runbook
- Warm Standby
- Runbooks Digest
4. Extend it
- Rules and Sieve
- Aliases Lists and Public Folders
- Rooms and Equipment
- Mailing Lists
- Routes and Relays
- Mail In to a Webhook
- Outbound Shaping
- The COM API and Scripting
- Event Scripts
- The REST API
- Command Line
- APIs Reference
5. Contribute to it
- Project Handbook
- Architecture
- Contributing
- Release Process
- Governance
- Assurance Case
- Regression Test Environment
- Fuzzing
- Regulatory Scope
- Third-Party Binaries
Look it up — from any journey
- Settings Reference
- Settings Overview
- Capabilities and Configuration
- Control Panel Reference
- Control Panel Pages
- Ports Reference
- Changes-Since-6210
- Version-History-to-6210
- Glossary
About this wiki
- hMailServer 6.3.8 is the latest release (2 November 2026, schema 6108)
- Pages say since 6.3.4 where a feature is new in it
- AGPL-3.0-or-later
- Repository, the one place the project is worked on
- Its mirror on GitHub, since 18 October 2026, with no Issues
- Questions: a GitLab issue with the Question template, GitHub Discussions Q&A, or the forum
- Report a documentation error: a GitLab issue naming the page