Repository navigation
PR 0130 Vulkan admit fallback combiners without active mux
State: Merged Reviewed head: 93a5620d083e33ce607d80c4246bb71b7b633c32 Role: Supporting implementation/test history. The primary technical reference is Performance-Research-G07-Hybrid-Ubershader-Specialization.
Admission checks should inspect state actually consumed by active work. A global unsupported mode is irrelevant when no active stage uses it.
flowchart LR
A["Before: Any LSB mux selector rejected fallback, even inactive or zero-stage cases."] --> B["PR #130"]
B --> C["After: Reject only an active stage that actually enables unsupported mux behavior."]
Admission checks should inspect state actually consumed by active work. A global unsupported mode is irrelevant when no active stage uses it.
- Do not infer correctness or cost from labels such as clean, finish, same handle, or disabled.
- Preserve the ownership, range, publication, retry, identity, or progress contract exposed by the PR.
- Keep focused correctness evidence separate from broad throughput claims.
- Re-run the relevant negative control when moving the mechanism to another renderer or subsystem.
- PR #130
- Reviewed head: 93a5620d083e33ce607d80c4246bb71b7b633c32
- Primary technical reference: Performance-Research-G07-Hybrid-Ubershader-Specialization
This page records what the PR taught us. Current design, source status, future experiments, and acceptance rules belong on the linked technical reference page.
DSP tooling guide and navigation updated November 2, 2026 for experimental PR #384, source 8f51d237. Capture/replay usage and limits.
The earlier wiki-wide review was published November 1, 2026. Emulator source: b7140848. Reviewed wiki content: 1d2b671. Current status · Release availability · Publication process.
- Home
- Current status
- Stable versus main
- Implemented mechanisms
- Controls and defaults
- Measured results and limits
- Complete change register
- System
- CPU and vCPU
- Memory and DMA
- Graphics / NV2A
- APU and audio
- Timing and timers
- Platform and I/O
- Hardware observations
- Fidelity boundaries
- Methodology
- PGR2 routes
- Debugging lag / hot paths
- Tools and commands
- DSP capture, replay and fuzzing
- HLE readiness and public XISO proof
- Concurrent DSP shadow and OpenAL proof
- DSP HLE operation inventory
- DSP HLE fix examples and testing
- Development
- Upstream shortlist
- Wiki maintenance
- Research / retired work
- Optimization catalog
- Hot-path shortcuts
- Researched experiments
- Unproven proposal directory
- PR lessons
- September26 snapshot
Repository · PRs · Issues