Skip to content

OREx Software

Eric E Palmer edited this page Oct 23, 2026 · 1 revision

Version

  • v3.0A2 - Blessed Class B
  • v3.0.1 - Updated to support Level 0
  • v3.0.2 - Fixed Autoregister
  • v3.0.3 - Fixed CR-324. Small issues
  • v3.0.4 - Bug fix for albedo - averaged adjoining pixels
  • v3.0.5 - 2nd bug fix for albedo - averaged only useful adjoining pixels

Systems

Testing

  • spc-legacy - Running 3.0A2 - This system used to be ormacsrv1.
  • ormacsrv2 - Running 3.0.5

Operations

  • spc1 - Running 3.0.5 (24 cores)

  • spc2 - Running 3.0.5 (24 cores)

  • spc3 - Running 3.0.5 (24 cores)

  • spc4 - Running 3.0.5 (24 cores)

  • spc5 - Running 3.0.5 (8 core machine)

  • ormacsrv1 - Distribution only. No SPC code


Software Changes

  • ECR-0077 - OCAMS Image Orientation (flipping the images horizontally)
  • CR-324 - Buf and format fixes to SPC 3.0.2 in time for Bennu late approach
    • STER 75 - residuals RMS value
    • STER 80 - Syn search location for SCOBJ_SHIFT.TXT
    • STER 81 - Fix pinhole to focal plane shift in REGRES
    • STER 83 - SPC Image names consistent with other tools
    • STER 84 - Photometric model was not updated for the published version that includes the factor of 2
    • STER 85 - Charge the frame transfer time value to be a configuration value

Categories

A quick links to changes in each software's manual


Useful OREx info

Cameras

  • PolyCam
  • MapCam
  • SamCam
  • TAGCAM
  • NavCam
  • NFTCam

Shape Model Deliveries (FDS, Draft, Final)

Delivery Date Name Source Data Resolution Error Who
17 Nov Limber_300A.v1 9 and 12 Nov 2.5, 2.0m 4m Team
23 Nov Limber_150B.v1 13, 16, 19 Nov 2.0, 1.8, 1.6m FDS
29 Nov Limber_150C.v1 23, 25 Nov 1.3, 1.1m FDS
5 Dec Limber_150D.v1 27, 29 Nov, 1 Dec 90, 70 40 cm FDS
7 Dec Limber_150E.v1 (skipped) 2 Dec 30cm FDS
12 Dec Approach150.v1 All Approach (Was model D) 2m Team
14 Dec SPC_75NP.v1 4, 5 Dec (LUT) 8, 9 Dec 75cm FDS
18 Dec SPC_75EQ.v1 12, 13 Dec 75cm FDS
21 Dec SPC_75SP.v1 15, 16 Dec 75cm FDS
31 Dec SPC_75Draft.v1 All App &PS 75cm 1m FDS
21 Jan PS_75.v1 All App &PS 75cm 1m Team

Approach, 8-22 Nov, 162-100km, 2.2-1.4m Close Approach, 25Nov - 2 Dec, 82-23km, 1.1-0.31m PreSurvey, 4-16 Dec, 11-7km, .82-.50m


Old Testing Things

Clone this wiki locally