OREx Software
Eric E Palmer edited this page Oct 23, 2026
·
1 revision
- v3.0A2 - Blessed Class B
- v3.0.1 - Updated to support Level 0
- v3.0.2 - Fixed Autoregister
- v3.0.3 - Fixed CR-324. Small issues
- v3.0.4 - Bug fix for albedo - averaged adjoining pixels
- v3.0.5 - 2nd bug fix for albedo - averaged only useful adjoining pixels
- spc-legacy - Running 3.0A2 - This system used to be ormacsrv1.
- ormacsrv2 - Running 3.0.5
-
spc1 - Running 3.0.5 (24 cores)
-
spc2 - Running 3.0.5 (24 cores)
-
spc3 - Running 3.0.5 (24 cores)
-
spc4 - Running 3.0.5 (24 cores)
-
spc5 - Running 3.0.5 (8 core machine)
-
ormacsrv1 - Distribution only. No SPC code
- ECR-0077 - OCAMS Image Orientation (flipping the images horizontally)
- CR-324 - Buf and format fixes to SPC 3.0.2 in time for Bennu late approach
- STER 75 - residuals RMS value
- STER 80 - Syn search location for SCOBJ_SHIFT.TXT
- STER 81 - Fix pinhole to focal plane shift in REGRES
- STER 83 - SPC Image names consistent with other tools
- STER 84 - Photometric model was not updated for the published version that includes the factor of 2
- STER 85 - Charge the frame transfer time value to be a configuration value
A quick links to changes in each software's manual
- 3.0A2 - CategoryThreeAlphaTwo - Baseline for all Pre-launch testing
- 3.0.1 - CategoryThreeOhOne -- This includes
- 3.0.1 - process_fits, make_sumfiles, regres
- 3.0.2 - (no user interface or function change -- minor bug only to autoregister)
- 3.0.3 - CategoryThreeOhThree - feature in register and INIT_LITHOS.TXT
- 
- SPC-OREx Naming Convention
- FITS Keywords
- PolyCam
- MapCam
- SamCam
- TAGCAM
- NavCam
- NFTCam
| Delivery Date | Name | Source Data | Resolution | Error | Who |
|---|---|---|---|---|---|
| 17 Nov | Limber_300A.v1 | 9 and 12 Nov | 2.5, 2.0m | 4m | Team |
| 23 Nov | Limber_150B.v1 | 13, 16, 19 Nov | 2.0, 1.8, 1.6m | FDS | |
| 29 Nov | Limber_150C.v1 | 23, 25 Nov | 1.3, 1.1m | FDS | |
| 5 Dec | Limber_150D.v1 | 27, 29 Nov, 1 Dec | 90, 70 40 cm | FDS | |
| 7 Dec | Limber_150E.v1 (skipped) | 2 Dec | 30cm | FDS | |
| 12 Dec | Approach150.v1 | All Approach (Was model D) | 2m | Team | |
| 14 Dec | SPC_75NP.v1 | 4, 5 Dec (LUT) 8, 9 Dec | 75cm | FDS | |
| 18 Dec | SPC_75EQ.v1 | 12, 13 Dec | 75cm | FDS | |
| 21 Dec | SPC_75SP.v1 | 15, 16 Dec | 75cm | FDS | |
| 31 Dec | SPC_75Draft.v1 | All App &PS | 75cm | 1m | FDS |
| 21 Jan | PS_75.v1 | All App &PS | 75cm | 1m | Team |
Approach, 8-22 Nov, 162-100km, 2.2-1.4m Close Approach, 25Nov - 2 Dec, 82-23km, 1.1-0.31m PreSurvey, 4-16 Dec, 11-7km, .82-.50m
- User Manual Author's Task List
- SPC_V_and_V_testing - Directions and guideline for testing
- Test_wish_list -- What tests should we run
- Software Status -- Software check-in and status record
- ORex_specific -- Info about the configuration used at the SPOC
- Regress_for_3.0B3_status
- Regress_for_3.1_status
- Documentation