Here are the tests that are desired to be done during Phase E
| Test | Description | Priority | Effort | Customer |
|---|---|---|---|---|
| Action | ||||
| Pole Wobble | Test the new modules that were changed in support of the Rosetta mission to support Pole Wobble. Std error. | Action | 12 weeks prep + 12 weeks | SPOC |
| Shape 3 redo | Run Approach phase testing to see if the improved procedures performs as well as test F4 | Action | 8 weeks | Jackson |
| Update code to SPC v3.1 | Incorporate the improvements that Gaskell added to SPC during the Rosetta mission. Supports pole wobble more effectively | Action | 16 weeks | SPOC |
| Max Slope | Do a paremeter study of the impact of the MXSLP variable, currently used for 0.6 | Action | 4 weeks | Jackson |
| OLA Albedo Integration | Work out integration of albedo into OLA | Action | 3 weeks | Lockheed - Lorenz |
| Pole and Omega on F4 | Need to run the pole and omega using F4's final shape model. May need Gaskell to train | Action | 3 weeks | Palmer |
| High | ||||
| FDS Integration | Develop the procedures and run an Approach/PreSurvey test that works on the transition to landmark navigation that contains multiple sets of data being passed | High | 8 weeks | FDS |
| Image Quality | Generate a shape model using low(er) quality images that contain PSF, blur, hot pixels and cosmic rays | High | 8 weeks | AltWG |
| Asteroid wall | Process Lockheed's asteroid wall | High | 12 weeks | Lockheed |
| NFT-SPC Thread Test | Generate NFT Features and use for Decent to TAG simulation | High | scope is uncertain | Lockheed - Lorenz |
| Enhanced Imaging | Develop requirements and imaging plan to support. Develop high resolution DTM's based upon it | High | 12 weeks | SPOC |
| Center of Figure / Center of Mass | SPC can shift the system of coordinates. FDS needs to have the COF mapped to COM for navigation | High | 14 weeks | FDS |
| Medium | ||||
| Operations Test: Parallel processing and team | Run Preliminary Survey and Detailed Survey portions of the mission using multiple people and multiple machines | Medium | 8 weeks | SPOC |
| Update F2/F3 with Cross Correlation | Recompute the RMS using manually process and a Normalized Cross Correlation | Medium | 5 weeks | Palmer |
| Low | ||||
| Low | 2 weeks | Palmer | ||
| Must be prioritized | ||||
| Dynamics test | Do an evaluation of SCOBJ and PTG with and without the use of dynamics | 8 weeks | Palmer | |
| Uncertainty test | See the effect of different amounts of uncertainty in the solution of SPC | 8 weeks | Palmer | |
| Have starting model signif different than truth | The existing Shape 4 is only 2 meters different than the Nolan model. Run a test where we greatly increase the deviation between starting and truth | 12 weeks | Jackman | |
| NavCam distortion | Put in camera distortion for the source images and see how well SPC removes it. This is more needed for NavCam | 5 weeks | Jackman | |
| Size vs. speed error | Have a model that has a systematic error so that the size of the model is off. Then use Gaskell's speed correction analysis to identify and fix a size variation | 6 weeks | Palmer |
Anybody want anything else?