Skip to content

Provider CovaU

bolagnaise edited this page Oct 15, 2026 · 1 revision

CovaU SolarMax

Select CovaU SolarMax during setup or under Configure > Electricity pricing & provider. This provider models a specific plan snapshot and its import/export allowances; it is not an unlimited zero-price window.

Select the plan

Enter the postcode and choose the offer matching the distributor, state and effective account terms. Public plan discovery is available for supported SolarMax offers; an offer name alone does not prove it matches your account. The flow validates source/snapshot identity and can request a manual snapshot when discovery cannot provide the required plan.

The snapshot records ordinary import periods, supply charge, base FiT, free-import window/cap and premium-export window/cap/total rate. Enter exact values from the written plan on the manual path. A wrong distributor, unsupported/incomplete structure or mismatched snapshot must be corrected rather than bypassed with another customer's plan.

The initial manual fallback is a fixed SolarMax template: overnight import 00:00–06:00, peak import 15:00–21:00, day import in the other hours, free-import allowance 11:00–14:00 and premium-export allowance 18:00–21:00. The HA form edits its rates/caps, not arbitrary window times. If your contract differs, do not force it into that template; use a matching validated snapshot through the supported options path or resolve the plan support first.

Measured allowances

Select the cumulative import/export energy sensors requested by the form. Use site energy counters in supported Wh/kWh/MWh units, not live W/kW power sensors. The quota ledger uses measured settlement data and its confidence; a missing or uncertain allowance state is not proof of remaining free import or premium export capacity.

Ordinary base FiT remains separate from a capped premium top-up. Household use consumes site import allowances too. Do not replace the ordinary tariff with a permanently free rate after selecting an allowance model.

Verify and update

Confirm the chosen plan/distributor/effective terms, local windows, current tariff price and allowance status. Update the exact snapshot when the account terms change. A saved snapshot does not establish a settled retailer bill or physical dispatch; review Smart Optimization and the battery route separately.

Field reference

The tables use the current form labels and help text. They list the conditional field union: a field can be hidden for a different battery, provider, route or available integration. The instructions above explain those conditions. Existing saved/discovered values take precedence over fresh fallbacks. Rate units follow the provider; check the displayed currency/energy unit.

CovaU SolarMax service area — initial setup

Field Meaning / input Fallback / limits
Supply postcode Use the value or available choice shown in this form; existing saved/detected values take precedence. Saved/detected value or the form’s shown fallback

CovaU SolarMax plan and settlement meters — initial setup

Field Meaning / input Fallback / limits
SolarMax plan Use the value or available choice shown in this form; existing saved/detected values take precedence. Saved/detected value or the form’s shown fallback
Network distributor Use the value or available choice shown in this form; existing saved/detected values take precedence. Saved/detected value or the form’s shown fallback
PCC import energy meter Preferred: select a monotonic total_increasing connection-point import energy sensor in kWh. Leave blank only to use continuous power-integrated estimation. Saved/detected value or the form’s shown fallback
PCC export energy meter Preferred: select a monotonic total_increasing connection-point export energy sensor in kWh. Leave blank only to use continuous power-integrated estimation. Saved/detected value or the form’s shown fallback

Manual CovaU SolarMax tariff — initial setup

Field Meaning / input Fallback / limits
Plan ID Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback manual_covau_solarmax
Plan name Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback Manual CovaU SolarMax
Network distributor Use the value or available choice shown in this form; existing saved/detected values take precedence. Saved/detected value or the form’s shown fallback
Effective date Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback blank (see retention/clear rules)
00:00-06:00 import rate Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback 16.5; 0–1000; step 0.001
Day/shoulder import rate Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback 35.17; 0–1000; step 0.001
15:00-21:00 import rate Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback 58.78; 0–1000; step 0.001
Daily supply charge Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback 171.996; 0–1000; step 0.001
Base export rate Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback 5.0; 0–1000; step 0.001
Daily free-import allowance Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback 50.0; 0–1000; step 0.001
Premium export total rate Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback 15.0; 0–1000; step 0.001
Daily premium-export allowance Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback 30.0; 0–1000; step 0.001

CovaU SolarMax pricing — existing installation

Field Meaning / input Fallback / limits
SolarMax plan Use the value or available choice shown in this form; existing saved/detected values take precedence. Saved/detected value or the form’s shown fallback
Network distributor Use the value or available choice shown in this form; existing saved/detected values take precedence. Saved/detected value or the form’s shown fallback
PCC import energy meter Use the value or available choice shown in this form; existing saved/detected values take precedence. Saved/detected value or the form’s shown fallback
PCC export energy meter Use the value or available choice shown in this form; existing saved/detected values take precedence. Saved/detected value or the form’s shown fallback
Refresh this public plan snapshot Use the value or available choice shown in this form; existing saved/detected values take precedence. Fallback Off

Clone this wiki locally