Codes and custom fields
Goal: attach your own classifications (activity codes, such as Location) and your own fields (such as Contractor) to your tasks.
Besides the fixed data of a task (name, duration, relations, …) you can add data of your own. If you want to classify tasks by north wing and south wing, by discipline, or keep track of which contractor carries out a task, you record that yourself. There are two ways, and the difference matters.
An activity code is a classification with a fixed pick list. You create a code type (for example Location) with values (N for the north wing, Z for the south wing). A task gets at most one value per code type.
A custom field (under Custom fields in the window) is a free input field with a type: Text, Number, Integer, Cost, Date or Yes/no. The field can hold a different value on every task.
- Choose Planning › Structure › Codes & fields.
- Creating a code type. Under New code type (e.g. Location) type the name and press Enter, or click Add code type.
- Adding values. Under the code type, click Add value. The app puts a provisional code there, such as V1. Change it in the Code box (short, the way you would type it: N), fill in a Description if needed (North wing) and pick a Colour. A change counts as soon as you leave the box or press Enter.
- Creating a custom field. Under New field (e.g. Contractor) type the name, choose the type and click Add field (or press Enter).
The window has no OK button: every change applies at once. You cannot change a field's type afterwards, only its name. If you want a different type, create a new field.
You have two places.
- In the Properties panel (or in the window you open with F2). At the bottom is the Codes & fields block: a pick list per code type, an input per field. The block only appears once there is at least one code type or field.
-
As a column in the task list. Click the + on the right of the table header (Add column) and, under Custom, choose the code type or field. In a code type's cell you type the code, for example
N, or pick from the list. A code that does not exist gives Choose a value from this activity code.
You can use a code type or custom field to filter, group and sort. You set that up with a layout: View › Layout › New layout. In the window, tick the parts you want to capture. With Save you get a button in View › Layout that you can click again later; with Apply without saving you only put it on screen now. When grouping, tasks without a value go under (none).
For the bar colour choose View › Baselines & progress › Bar colors, then By category and the code type. Each bar then gets the Colour of its value.
Deleting removes the values on the tasks. If you delete a code type, a value or a field with the bin, the app does not ask for confirmation, and the assignments on all tasks disappear with it. A grouping or sorting on that code type or field lapses too. Undo (Ctrl+Z, close the window first) brings back the code type, value or field and the filled-in values, but not the grouping or sorting: you set those up again.
Two values with the same code. Add value numbers on from the number of values there are. If you delete one and add one, a code can therefore occur twice. If you type that code in a column cell, the app refuses with This activity code value occurs more than once. Choose it from the list. Give every value its own code.
Templates do not take codes and fields along. See Saving and inserting WBS templates. If you paste tasks into another document, the app clears codes and fields that do not exist there and tells you.
A date field does not move along. If you move the whole project, filled-in custom fields of the type Date stay on their date. The app warns about this in the preview.
- Adjusting the structure: the WBS tree, the other way to organise tasks.
- Moving a project: what happens to dates when you move the project.
- Creating and using a layout: grouping and filtering on a code or custom field.
- Adjusting table columns: showing a code or custom field as a column.
- 6 New Terraced Houses, De Akkers: the activity codes House and Discipline, the custom field Cost estimate and notes (open and completed).
public/docs/en/ and docs/wiki/ — direct wiki edits are overwritten on the next release.
Open Planner Studio · LGPL-3.0 · part of the OpenAEC-Foundation
Open Planner Studio
Tutorials
Step-by-step tutorials live in the app: install the Tutorials extension via Help › Tutorials.
How-to guides
- Adding relations
- Adding tasks and milestones
- Adjusting the structure
- Saving and inserting WBS templates
- Codes and custom fields
- Splitting a task
- Moving a project
- Selecting, deleting and undoing tasks
- Tracing a path
- External relations to another project
- Setting a constraint or deadline
- Creating a hammock
- Creating and assigning a calendar
- Generating holidays and the construction holiday
- Setting up a resource calendar
- Turning on hour planning
- Setting working times
- Managing resources
- Assigning resources with a curve
- Adjusting the hour distribution
- Choosing a task type
- Resolving overallocation
- Choosing or building a calculation profile
- Saving and managing a baseline
- Updating progress
- Importing progress from a spreadsheet
- Choosing the progress mode
- Making and printing a report
- Choosing the reporting period
- Creating and using a layout
- Adjusting table columns
- Using split view and the mini-map
- Dragging, panning and zooming in the Gantt
- Presenting on a large screen
- Working with several projects at once
- Opening and saving a file
- Turning on AutoSave
- Opening an MS Project file (.mpp)
- Opening a Primavera P6 file (.xer)
- Exporting
- Choosing the IFC schema
- Recovering after a crash
- Using the resource library
- Managing and sharing resource libraries
- Using the occupancy overview
- Installing and managing an extension
- Connecting an AI assistant (MCP)
- Giving feedback
- Updating the app
Explanation
- Planning well
- Critical path and float
- Relations and lag
- Constraints and deadlines
- Calendars and working days
- Days and hours
- Task types: duration, units and work
- Resource leveling
- Progress, status date and baseline
- Calculation profiles and conventions
- Files and formats
- Dates as recorded
- The resource library
- How the AI link works
Reference
- The ribbon, tab by tab
- Task dialog and properties panel
- Calendar windows
- Resource panel
- Table columns
- Notifications and warnings
- AI tools (planner_*)
- Keyboard shortcuts
- Right-click menus
- App settings
- New project and Project settings
- Calculation options and conventions
- Import and export formats
- Report types
- Extension permissions
Project