Skip to content

EN Start Gallery

wanoo edited this page Oct 23, 2026 · 1 revision

Gallery

Français · Type: reference · Audience: player, author · Context: player's browser · Status: ready · Applies from: 4.1.19

Screenshots of the sample game, The Pantry Key, and of the local Studio, taken from the real production build and the real Studio by npm run docs:screenshots, never mock-ups. Each picture has its important labels written out below it.

These captures were taken at 4.1.19 (11 October 2026). Since then the interface font changed (Galmuri11, 4.3.0), the hero can be chosen at New Game (4.3.0), and the Studio gained a hero × language matrix and before/after captures (4.4.0): none of those shows here yet. To see the current version, play it at wanoo.github.io/quest-n-click.

The game

The Pantry Key: Grandma's living room, with a grandmother and a cat on a rug; on the right the nine verbs and an empty bag; at the bottom the tools and the sentence line "Walk to"

Grandma's living room. On the right, the verbs Give, Open, Close, Pick up, Look at, Talk to, Use, Push, Pull ("Look at" is selected), the bag (six empty slots) and four tools: the other playable character (the cat), the map, the pause menu, the sound. Under the scene, the sentence line: Walk to.

Talking to Grandma: her portrait and topics in the right-hand column

A conversation. The column on the right shows Grandma and her topics: Where is the key?, What is for dinner?, Why lock the sardines?, Can I have a cuddle?, Bye!

The world map: Grandma's and Grandpa's portraits pinned on France, a third face on the Mediterranean, the places to go in the side column

The world map. The characters are pinned where they are; the column asks Where to? with Grandma's house ! (something new there), The garden, The market and Back.

The pipes minigame: tiles to turn between a water tank and the mushrooms, a Skip button at the top right

A minigame, pipes. The instruction, from Grandma on the shell phone: Tap a pipe to turn it. Bring the water to the mushrooms. A Skip button at the top right. It plays by touch or with the keyboard.

The Studio

Studio, Rooms tab: Grandma's house in the placement editor with the hotspots outlined, the list of props and actors, and the pantry cupboard selected with its states, look lines and reactions

The Rooms tab. The tabs along the top: Rooms, Storyboard, Assets, Voices, Music, Check, Play, Language, Remix, Notes, then Undo, Redo, Play and Assistant. The room Grandma's house (house) in the placement editor; on the right the Props (pantry, armchair, clock, table, chair, shell, teacup) and Actors; the prop pantry selected, with its states locked and open, its Look lines and its Reactions.

Studio, Check tab: the validator with no error, the solver's 15-step winning path, the solver health table, and the start of the world graph

The Check tab. Validator: no error, 0 warning(s). Solver: solved: the ending is reached (35 states explored; --prove checks every state), with its fifteen steps, from "(tutorial) Look at pantry" to "Use key with pantry". Solver health (runs, actions skipped, what splits the states). World: the three rooms and their exits.

Studio, Storyboard tab: five boards on the left, the board "Opening and tutorial" with its panels and lines, and a preview of the first panel on the right

The Storyboard tab. 100 % — 165 implemented, 0 partial, 0 missing. Five boards: Opening and tutorial, Grandma's house, The garden, The market, The pantry. Panel 1, Bad news, with Grandma's and Pixel's lines; on the right the panel's preview and its notes.

Studio, Assets tab: the hero's sprite sheet, a cat in 24 cells, each labelled with its use

The Assets tab. Prepare assets (npm run assets), all prepared, 25 sheets, 401 images, 6 backgrounds, 23 sounds. The sheet hero (Pixel, a 6 × 4 grid, 24 cells, 19 used): each cell labelled portrait, walk, idle, curl… or unused; Copy prompt and Upload generated sheet….

The puzzle graph: nodes for players, places, items, flags and actions, the critical path highlighted, the rest faded

The puzzle graph (Check tab). 93 nodes; green arrows produce, red ones consume. Critical path on: 40 critical, 47 out of the solver's state; nodes such as tank_drained, shell phone, use pipe + tank, pantry key.

Taking them again

# in the engine repository, after npm ci and npx playwright install chromium
npm run docs:screenshots

It builds the game into .cache/docs-dist, plays the sample game through the end-to-end harness and drives the Studio with Playwright, then writes WebP files named for the release that took them (4119-<name>.webp at 4.1.19); a release's captures never overwrite another's. --only=game|studio takes one half; --keep-png keeps the raw captures. The script: scripts/docs-screenshots.mjs.


Edit the source of this page · Report an error

Home

Index (6)
Start (6)
Play (9)
Install (17)
Create a game (55)
Engine (4)
Local Studio (24)
Team Studio (21)
Clever Cloud (23)
Reality Bridge and connectors (16)
Contribute (25)
Reference (7)

Clone this wiki locally