Skip to content

ISTQB Compliance Review

CI Agent edited this page Sep 9, 2026 · 1 revision

ISTQB Compliance Review — TestLink 2.0.1 Coverage Matrix

Issue: #1054 Type: investigation (documentation + backlog triage — no application code changes) Date: 2026-09-09 Status: VERIFIED-FIXED

This review maps the ISTQB (International Software Testing Qualifications Board) fundamental testing process and supporting concepts against the features actually implemented in this TestLink 2.0.1 modernization. Every "Full"/"Partial" claim is grounded in a real repository artifact (API area, docs/ page, modernized screen) so a developer can open the cited source to confirm.


1. ISTQB context

ISTQB Foundation Level describes a fundamental test process with the phases: test planning & control → test analysis & design → test implementation & execution → evaluating exit criteria & reporting → test closure activities. Around it sit supporting concepts: test strategy, test levels, test types, risk-based testing, static testing (reviews), traceability, and metrics/reporting.

TestLink 1.9.20 (and this modernization of it) was architected primarily as a test-case execution + reporting tool. The review below shows which ISTQB concepts are fully, partially, or not at all represented in the product's data model and screens.


2. ISTQB ↔ TestLink coverage matrix

Legend: Full = first-class, dedicated feature · Partial = possible but without a dedicated ISTQB-first model · Missing = no representation.

# ISTQB concept Current TestLink support Coverage Evidence (repo) Notes
1 Test strategy No explicit strategy model (no global vs per-level strategy doc/object in schema, no strategy field) Missing scan of lib/ + api/ found no strategy entity Can be approximated by free-text docs/custom fields only
2 Test planning Test Plan object with scope, status, active/archive, milestones, assigned builds/platforms Partial api/plans/, docs/Test-Plan-Management.md, WIKI-TEST-PLAN-MILESTONES.md, api/milestones/ Plan scheduling/timeline, owner, resources and effort estimation absent
3 Test analysis Requirement specs (ReqSpec + Requirement with versions) and review of requirement coverage Partial api/requirements/, api/reqspec/, api/reqcompare/, docs/Requirement-Editor-Modernized.md, WIKI-REQUIREMENT-SPEC-MANAGEMENT.md No dedicated "test conditions" artifact separate from test cases
4 Test design Test Case editor: steps, preconditions, expected results, importance/urgency (priority), keywords, custom fields Partial api/testcasesedit/, api/testcases/, docs/Test-Case-Editor-Modernized.md, docs/Test-Case-Bulk-Operation-Modernized.md No support for equivalence partitioning/BVA modelling tooling; TC is the unit
5 Test implementation Assign TC to plan, execution assignment to testers, builds, platforms, priorities Full api/tcassign2tplan/, api/execassignment/, api/builds/, api/platforms/, docs/Test-Case-Assign-to-Test-Plan-Modernized.md Strong, first-class implementation flow
6 Test execution Execute test case, record result per step, execution type, notes, attachments, execution history, set batch results Full api/execute/, api/executionedit/, api/execsetresults/, api/executeexport/, docs/Assign-Test-Case-Execution-Modernized.md Core strength of the product
7 Test evaluation / reporting Results by status/tester/suite/issue, TC-flat, absolute-latest, metrics dashboard, test-result matrix, baselines, charts Full api/results/, api/metrics/, api/reports/, docs/Results-By-Status-Modernized.md, docs/Reports-Test-Result-Matrix.md, docs/General-Test-Plan-Metrics.md, docs/Execution-Timeline-Statistics-Modernized.md Rich reporting/reporting BFF. Exit-criteria evaluation (pass% thresholds) is Manual, not enforced
8 Test closure No dedicated closure workflow: no lessons-learned, retrospective, closure report or closure checklist Missing grep of lib/+api/ for `lesson closure
9 Test levels (component/integration/system/acceptance) No level taxonomy field on plan/TC; only a top-level suite hierarchy Missing no test.level/testtype field in schema Could be simulated with suite naming/CF
10 Test types (functional / non-functional: performance, security, usability…) No structured type taxonomy; keyword tagging is the only free-form proxy Partial api/keywords/, docs/WIKI-KEYWORDS-ASSIGN.md, docs/WIKI-KEYWORDS-SI-TAGS.md Keywords allow classification but not an enforced ISTQB type model
11 Risk-based testing Priority computed from importance × urgency (lib/functions/testcase.class.php:4688,6826), filters per plan Partial lib/functions/testcase.class.php priority calc; plan-level priority filters No likelihood/impact (product-risk) model, no risk-priority chart, no risk-based selection automation
12 Static testing (reviews) No review workflow for Test Cases, Requirements or Specs (no reviewer/review-status entity, no review checklist) Missing scan of lib/+api/ found no review/reviewer entity Should be a backlog task
13 Traceability Requirement ↔ Test Case coverage (covered/uncovered), requirement version compare, TC ↔ issue-tracker linkage, keyword tagging Full api/reqcompare/, docs/Requirements-Coverage-Modernized.md, docs/Requirement-Management-Systems-Modernized.md, lib/requirements/reqView.php, lib/results/uncoveredTestCases.php Req↔TC traceability is a real strength; traceability to quality objectives/risks is the missing axis
14 Metrics & reporting Metrics dashboard, per-status/per-tester/per-suite/per-build, never-run, without-tester, TCs-created-per-user, timeline statistics, baselines Full api/metrics/, docs/Test-Cases-Never-Run.md, docs/Test-Cases-Without-Tester.md, docs/Baselines-L1-L2.md Strong; lacks pre-defined ISTQB-style exit-criteria dashboards and defect-density vs risk
15 Defect management Issue tracker integration (Jira/Bugzilla/Redmine/GitHub…) and "results by issues" report Full api/trackers/, api/codetracker/, docs/Feature-433-Native-GitHub-Code-Tracker.md, docs/Results-By-Issues-Modernized.md External BTS linkage covers defect tracking

Coverage summary

Coverage Count Concepts
Full 6 Test implementation, execution, evaluation/reporting, traceability (req↔TC), metrics, defect mgmt
Partial 4 Test planning, analysis, design, risk-based (priority proxy), test types (keywords)
Missing 5 Test strategy, closure, test levels, static testing/review, quality-objective traceability

3. Gap list (prioritized backlog candidates)

Priority ISTQB concept Gap Suggested backlog item
High Test closure No lessons-learned / closure / retrospective workflow task: Closure report + lessons-learned module
High Risk-based testing No structured risk model (likelihood/impact/product-risk) task: Risk-based testing model + risk-coverage view
High Traceability to quality objectives/risks Req↔TC exists; objective/risk traceability doesn't task: Quality-objective & risk traceability matrix
Medium Static testing / reviews No review workflow for test cases/requirements/specs task: Peer-review workflow for test cases & requirements
Medium Test strategy No strategy artifact task: Test strategy document object linked to plans
Medium Test levels & types No level/type taxonomy task: Enforced test-level & test-type classification
Low Exit-criteria enforcement Pass% thresholds not enforced in evaluation task: Configurable exit-criteria thresholds on test plans
Low Test planning depth No timeline/resource/effort estimation on plans task: Plan scheduling + effort estimation

4. Backlog items filed

The gaps above are filed as separate, self-contained task-labeled GitHub issues so the CI factory (implement-task-*) can pick them up independently. Each references this review (Refs #1054):

Issue Gap addressed
#1277 Risk-based testing model (likelihood/impact + risk-coverage view)
#1278 Test closure module (lessons-learned + closure report)
#1279 Test review / static-testing workflow for test cases & requirements
#1280 Quality-objective & risk traceability matrix

The lower-priority gaps (test strategy artifact, test levels/types taxonomy, exit-criteria thresholds, plan scheduling/estimation) are captured in §3 and may be filed as further task issues when capacity allows.


5. Recommendation / roadmap

To progress TestLink from an execution + reporting tool toward a fuller ISTQB-aligned platform, prioritize in this order:

  1. Risk-based testing model (highest value for prioritization) — reuses the existing importance×urgency priority hook.
  2. Traceability to quality objectives & risks — extends the existing strong req↔TC traceability.
  3. Test closure / lessons-learned — completes the ISTQB lifecycle.
  4. Static testing / review workflow — supports earlier-SDLC activities.
  5. Test levels/types taxonomy + test strategy artifact — formalizes planning vocabulary.
  6. Exit-criteria thresholds — makes evaluation actionable.

6. Validation

Because this issue changes no application code, the "regression" check is that every Full/Partial claim in §2 points to a real repository artifact. Verification was performed by:

  • opening the cited api/<area>/ directory for each Full/Partial row;
  • opening the cited docs/*.md page for each Full/Partial row;
  • grep-scanning lib/ + api/ for the Missing concepts (strategy, level, type, risk, review, closure) and confirming no dedicated entity exists.

No Event Viewer check is applicable (no runtime code executed). No security vectors introduced.

Clone this wiki locally