Repository navigation
Incident Timeline Template
Last reviewed: 2026-11-29
Prerequisites: Templates index ยท Incident Response playbook (enhanced) ยท Alert-to-case correlation.
A timeline and action log for one incident or exercise, kept while the response is under way and finished as the after-action record.
Records the documentation items from NIST SP 800-61 Rev. 3: the sequence of events, the assets involved and the root cause (RS.AN-03); a record of actions taken whose integrity and provenance are preserved (RS.AN-06); the estimated and validated magnitude (RS.AN-08); triage, categorization and prioritization (RS.MA-02, RS.MA-03); and an after-action report covering the incident, the response and recovery actions, and lessons learned (RC.RP-06).
Each event and action has a UTC time, a source and a confidence label, so a reviewer can tell what was observed from what was inferred or reported.
- Opening an incident record as soon as an incident is declared.
- Running a tabletop or lab exercise that should leave the same record as a real incident.
- Preparing the after-action review.
- Write times in UTC with a trailing
Z. Record each source's own time zone and any clock skew in Time Basis before converting. -
Confidence is
observed(seen in a log, capture or system),inferred(concluded from other events) orreported(told by a person or third party). These labels are this repository's convention, not an SP 800-61 term. - Record actions as they happen. Paper logbooks, audio or video, and session logging can all serve, as long as access is limited and the records are protected (RS.AN-06).
- Evidence collected for the timeline goes in the evidence and chain-of-custody record.
| Field | Value |
|---|---|
Incident ID (incident_id) |
{{incident_id}} |
Title (incident_title) |
{{incident_title}} |
Status (incident_status) |
{{incident_status}} |
Declared (UTC) (declared_utc) |
{{declared_utc}} |
Incident lead (incident_lead) |
{{incident_lead}} |
Record location (record_location) |
{{record_location}} |
Category (triage_category) |
{{triage_category}} |
Priority (priority) |
{{priority}} |
| Field | Value |
|---|---|
Time zone basis (time_zone_basis) |
{{time_zone_basis}} |
Clock sources (clock_sources) |
{{clock_sources}} |
Clock skew notes (clock_skew_notes) |
{{clock_skew_notes}} |
| Time (UTC) | Source | Event | Asset | Confidence | Evidence Ref |
|---|---|---|---|---|---|
| {{event_utc}} | {{event_source}} | {{event_description}} | {{event_asset}} | {{event_confidence}} | {{event_evidence_ref}} |
| Asset | Role | Owner | Impact |
|---|---|---|---|
| {{asset_name}} | {{asset_role}} | {{asset_owner}} | {{asset_impact}} |
| Field | Value |
|---|---|
Root cause (root_cause) |
{{root_cause}} |
Magnitude estimate (magnitude_estimate) |
{{magnitude_estimate}} |
Magnitude validation (magnitude_validation) |
{{magnitude_validation}} |
| Time (UTC) | Actor | Action | Record |
|---|---|---|---|
| {{action_utc}} | {{action_actor}} | {{action_taken}} | {{action_record}} |
| Field | Value |
|---|---|
Lessons learned (lessons_learned) |
{{lessons_learned}} |
Improvement actions (improvement_actions) |
{{improvement_actions}} |
After-action owner (after_action_owner) |
{{after_action_owner}} |
- NIST SP 800-61 Rev. 3 (April 2025): RS.AN-03, RS.AN-06, RS.AN-07, RS.AN-08, RS.MA-02, RS.MA-03 and RC.RP-06.
- NIST SP 800-86 (August 2006), section 3.4 reporting factors.
- README.md - Templates index
- examples/incident-timeline-example.md - filled example
- schema.json - machine-checkable structure
โฌ ๏ธ Templates index | Master Index | ๐ฏ Role Navigation | Legal Notice
๐ Source: Templates/incident-timeline.md | โ๏ธ Suggest an edit | โฌ
๏ธ Back to Report Templates
- ๐บ๏ธ Browse by Topic
- ๐ All Repository Files
- ๐งญ Learning Paths
- ๐ Master Guide
- ๐ค Glossary
- โ๏ธ Legal & Disclaimer
๐ Foundations & Learning
๐ก๏ธ Defense & Investigations
- Incident Response
- Open Source Intelligence (OSINT)
- Reverse Engineering
- Operations Security (OPSEC)
- Compliance
โ๏ธ Platforms & Infrastructure
๐ก Hardware, Wireless & Field Projects
- PNWC Cyberdeck
- Hardware Testing
- Hardware Hacking
- Software-Defined Radio
- Wardriving
- uConsole
- Space Security
๐งฐ Assessment & Field Reference
๐ฆ Downloads & Project Resources
๐๏ธ Additional Topics