Remediation Tracker Template
Last reviewed: 2026-11-29
Prerequisites: Templates index ยท Assessment findings lifecycle ยท Vulnerability finding template.
A plan of action and milestones (POA&M) for the findings of one engagement, kept up to date until every item is closed or formally accepted.
Records the four POA&M elements that NIST SP 800-115 cites from SP 800-37 (tasks, resources, milestones and scheduled completion dates), the SP 800-115 section 8.3 status of each item, its retest result and its SSVC decision. remediation-tracker.csv holds the same columns for spreadsheets and ticket imports.
Every item has one owner, an agreed date, a current status and a retest result, so the tracker can serve as what SP 800-115 section 8.2 calls a benchmark for tracking progress.
- After the report is delivered, to plan remediation with the client.
- At each status review, to update items as pending, partially accomplished or accomplished (SP 800-115 section 8.3).
- When importing findings into a ticketing or findings platform.
-
POA&M Status is
pending,partially accomplishedoraccomplished. Retest Result isnot retested, or one of the lifecycle's retest states:fixed,mitigated,accepted,still openorinconclusive. An accomplished item is not closed until it has been retested. -
SSVC Decision is
Track,Track*,Attend,ActorNot assessed. CISA describes Track as remediation "within standard update timelines", Attend as "sooner than standard update timelines" and Act as "as soon as possible". SSVC gives no day counts, so the scheduled date is agreed with the owner. - SP 800-115 section 8.3: test the fix in a replica environment where possible, get the system owner's approval through change control, then put the fix in place and verify it.
- The CSV header is
finding_id,asset,task,owner,resources,milestone,scheduled_completion,poam_status,retest_result,ssvc_decision,notes, one column for each column of the table below, in the same order. For later imports, build an idempotent key from engagement, asset and finding ID (lifecycle integration guardrails).
Canonical reference: Assessment findings lifecycle owns the import and retest workflow. This section is a summary.
| Field | Value |
|---|---|
Engagement ID (engagement_id) |
{{engagement_id}} |
Tracker owner (tracker_owner) |
{{tracker_owner}} |
Last updated (last_updated_date) |
{{last_updated_date}} |
CSV companion (csv_companion) |
{{csv_companion}} |
| Finding ID | Asset | Task | Owner | Resources | Milestone | Scheduled Completion | POA&M Status | Retest Result | SSVC Decision | Notes |
|---|---|---|---|---|---|---|---|---|---|---|
| {{item_finding_id}} | {{item_asset}} | {{item_task}} | {{item_owner}} | {{item_resources}} | {{item_milestone}} | {{item_scheduled_completion}} | {{item_poam_status}} | {{item_retest_result}} | {{item_ssvc_decision}} | {{item_notes}} |
| Date | Change | By |
|---|---|---|
| {{log_date}} | {{log_change}} | {{log_by}} |
- NIST SP 800-115, sections 8.2 and 8.3 and footnote 38.
- CISA SSVC Guide (November 2022): decision outcomes.
- README.md - Templates index
- remediation-tracker.csv - CSV companion
- examples/remediation-tracker-example.md - filled example, with CSV
- schema.json - machine-checkable structure
โฌ ๏ธ Templates index | Master Index | ๐ฏ Role Navigation | Legal Notice
๐ Source: Templates/remediation-tracker.md | โ๏ธ Suggest an edit | โฌ
๏ธ Back to Report Templates
- ๐บ๏ธ Browse by Topic
- ๐ All Repository Files
- ๐งญ Learning Paths
- ๐ Master Guide
- ๐ค Glossary
- โ๏ธ Legal & Disclaimer
๐ Foundations & Learning
๐ก๏ธ Defense & Investigations
- Incident Response
- Open Source Intelligence (OSINT)
- Reverse Engineering
- Operations Security (OPSEC)
- Compliance
โ๏ธ Platforms & Infrastructure
๐ก Hardware, Wireless & Field Projects
- PNWC Cyberdeck
- Hardware Testing
- Hardware Hacking
- Software-Defined Radio
- Wardriving
- uConsole
- Space Security
๐งฐ Assessment & Field Reference
๐ฆ Downloads & Project Resources
๐๏ธ Additional Topics